Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing And Laying Cast In Situ Ready Mix Cement And Etc
|
| Description |
Providing And Laying Cast In Situ Ready Mix Cement And Etc
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_JALNA_921090_1 |
|
Reference Number |
GP NALNI BK/05/2023 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | SARPANCH GRAMSEVAK NALNI BK |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | June 30, 2023 20:30 |
| End Date |
Expired
05/07/2023
Expired 1194 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreImprovement/upgradation of road from wani mohalla to fakeer mohalla chountwaliwar bala incl. tumbri mohalla and khori mohalla under cnt (machine mix laid with paver).
Improvement/upgradation of road from wani mohalla to fakeer mohalla chountwaliwar bala incl. tumbri mohalla and khori mohalla under cnt (machine mix laid with paver).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreFilling of potholes and patches with wet mix and crushing stone dust from pedda cheruvu mathadi road to tank bund in view of bathukamma festival-2026 under general fund
Filling of potholes and patches with wet mix and crushing stone dust from pedda cheruvu mathadi road to tank bund in view of bathukamma festival-2026 under general fund
Read moreLaying of balance concrete cement ( cc ) at market yard racharla boppapur of rajanna siricilla district.
Laying of balance concrete cement ( cc ) at market yard racharla boppapur of rajanna siricilla district.
Read moreTggenco-ktpp-ii-em-repair and rectification of 4600 kva, 11/4.1kv, m/s.bhel make dry type cast resin vfd transformer, vector group dyn11 (sl.no.2035033) of ktpp stage-ii
Tggenco-ktpp-ii-em-repair and rectification of 4600 kva, 11/4.1kv, m/s.bhel make dry type cast resin vfd transformer, vector group dyn11 (sl.no.2035033) of ktpp stage-ii
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreProcurement of 18.00x25, 32pr bias tyres e-4 tl with o-ring for beml ws28-2 28kl water sprinklers, beml gd825 motor graders and rt740 40t cranes working at different open cast projects.
Procurement of 18.00x25, 32pr bias tyres e-4 tl with o-ring for beml ws28-2 28kl water sprinklers, beml gd825 motor graders and rt740 40t cranes working at different open cast projects.
Read moreFormation of temporary road with wet mix in potholes from gantala rajender house to md. ankoosh house in ward no. 17 in jammikunta municipality (invited under earmarked works sc -communities are only eligible to participate)
Formation of temporary road with wet mix in potholes from gantala rajender house to md. ankoosh house in ward no. 17 in jammikunta municipality (invited under earmarked works sc -communities are only eligible to participate)
Read moreof your Industry type