Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Rcc Storm Water Drain From Mata Mandir To Existing Drain (Phase I) At Nagar Nigam, Agra, Distt Agra (U.P.)
|
Description |
Construction Of Rcc Storm Water Drain From Mata Mandir To Existing Drain (Phase I) At Nagar Nigam, Agra, Distt Agra (U.P.)
|
Organisation | Construction and Design Services UP Jal Nigam | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 11800 |
EMD | 5 Lakh |
Tender Value | |
Place | AGRA |
Link |
AAAAAAAAAA Login to view |
Start Date | May 15, 2025 14:30 |
End Date |
28/05/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreSupply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreIt addl. pune infotech park i industrial
Construction of 6 lane road using cement&#x0d concrete treatment with footpath and storm water pipeline&#x0d repairing and providing new curbing at center verge and&#x0d road furnitures from shivaji chowk to smashan bhumi&#x0d
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreConstruction of cc drain ward no. 13 from raghuraj school to house of dharmdas shahdol as per nit and estimate.
Construction of cc drain ward no. 13 from raghuraj school to house of dharmdas shahdol as per nit and estimate.
Read moreSpl repair to bldg no p-59 of mandir line at mcmm jabalpur under age b/r-i of ge (east) jabalpur
Spl repair to bldg no p-59 of mandir line at mcmm jabalpur under age b/r-i of ge (east) jabalpur
Read moreZone no. 03, ward no. 10, construction of rcc drain, culvert and road from dr. shabhakant dwivedi ji house to shri hari singh ji house.
Zone no. 03, ward no. 10, construction of rcc drain, culvert and road from dr. shabhakant dwivedi ji house to shri hari singh ji house.
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreof your Industry type