Tender Details
Particulars | Details |
---|---|
Title |
Rectification/Modification Of Damaged/Decayed Drive Base Frame Of Unit No. 227 And Replacement Of Tensioning S. S. Wire Rope, Rectification Of Tail Base Frame Of Unit No. 122 Belt Conv. And Replacement Of Snapped Conv. Belt 121 A ,80 Mtr N 1200 Mm Wid
|
Description |
Rectification/Modification Of Damaged/Decayed Drive Base Frame Of Unit No. 227 And Replacement Of Tensioning S. S. Wire Rope, Rectification Of Tail Base Frame Of Unit No. 122 Belt Conv. And Replacement Of Snapped Conv. Belt 121 A ,80 Mtr N 1200 Mm Wid
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_300939_1 |
Reference Number |
PO/KW/eTender/23-24/109, dated 09.02.2024 |
Tender Fee | 0 |
EMD | 4700 |
Tender Value | |
Place | Kedla Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=311740 |
Start Date | February 10, 2024 15:30 |
End Date |
20/02/2024 ( Expired 451 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Modification or rectification of skirt board of different unit no. 227, 247, 415, 302, 303, 304 belt conveyors along with conveyor supporting post replacement of main plant of kedla washery.
Modification or rectification of skirt board of different unit no. 227, 247, 415, 302, 303, 304 belt conveyors along with conveyor supporting post replacement of main plant of kedla washery.
Read moreRepairing/ strengthening of base frame of drive assembly (gearbox, motor and drive drum) along with replacement of its coupling of unit 801-b conveyor belt at moonidih coal washery.
Repairing/ strengthening of base frame of drive assembly (gearbox, motor and drive drum) along with replacement of its coupling of unit 801-b conveyor belt at moonidih coal washery.
Read moreReplacement of damaged decayed deck plate, channel, angle and top and bottom frame with idlers dismantling and reinstallation along with replacement of damaged tail base frame nondrive arrangement after tail snub pulley dismantling of unit no. 304
Replacement of damaged decayed deck plate, channel, angle and top and bottom frame with idlers dismantling and reinstallation along with replacement of damaged tail base frame nondrive arrangement after tail snub pulley dismantling of unit no. 304
Read moreDismantling, transportation, installation, commissioning n trial including necessary fabrication jobs including civil works of one no. 1200 mm width pvc belt conveyor for a length of 80 meters with complete drive head along 48 dip from 0l to -2l
Dismantling, transportation, installation, commissioning n trial including necessary fabrication jobs including civil works of one no. 1200 mm width pvc belt conveyor for a length of 80 meters with complete drive head along 48 dip from 0l to -2l
Read moreReplacement of damaged conv. belt along with conv. gallery damaged/decayed base frame supporting and strengthening and gear box, take-up arrangement, drive and non-drive pulley maintenance alignment of unit no. 302 b/c of main plant of kedla washery
Replacement of damaged conv. belt along with conv. gallery damaged/decayed base frame supporting and strengthening and gear box, take-up arrangement, drive and non-drive pulley maintenance alignment of unit no. 302 b/c of main plant of kedla washery
Read moreReplacement of damaged rubber buffer of electromagnetic vibrofeeder and damaged base frame of rake pinion gate no. b2, b3 , b5 of 121 b belt conveyors along with damaged and wornout liners support of incoming discharge chute as above unit main plan
Replacement of damaged rubber buffer of electromagnetic vibrofeeder and damaged base frame of rake pinion gate no. b2, b3 , b5 of 121 b belt conveyors along with damaged and wornout liners support of incoming discharge chute as above unit main plan
Read moreRectification/modification of drive base frame arrangement and under feeding hopper after g/box, drive and non-drive pulley dismantling and re-installation, alignment of unit 121aandb belt conveyor main plant of kedla washery.
Rectification/modification of drive base frame arrangement and under feeding hopper after g/box, drive and non-drive pulley dismantling and re-installation, alignment of unit 121aandb belt conveyor main plant of kedla washery.
Read moreTransportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Transportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Read moreReplacement and repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1301 belt conveyor from tail end to middle side at ps-9 section at madhuban coal washery un
Replacement and repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1301 belt conveyor from tail end to middle side at ps-9 section at madhuban coal washery un
Read moreTransportation and carrying with fitting of 110kw drive head ( unit ) and replacement of 1000 mm width 200 mtr belt at 19 d tb3 ( 3 no belt ) at millenium incline of shankarpur colliery under bankola area.
Transportation and carrying with fitting of 110kw drive head ( unit ) and replacement of 1000 mm width 200 mtr belt at 19 d tb3 ( 3 no belt ) at millenium incline of shankarpur colliery under bankola area.
Read moreof your Industry type