Tender Details

Particulars Details
Title
Provision Of Led Decorative Street Light Pole Arrangement Along The Road From Thirumalairajanar Bridge Road Junction Up To Nagapattinam Road Junction In T.R.Pattinam, Karaikal.
Description
Provision Of Led Decorative Street Light Pole Arrangement Along The Road From Thirumalairajanar Bridge Road Junction Up To Nagapattinam Road Junction In T.R.Pattinam, Karaikal.
Organisation Public Works Department | State Govt. and UT
Tender Id 2024_PWDC3_16686_1
Reference
Number
10/PW/BRK/2024-25
Tender Fee 525
EMD 78249
Tender Value
Place Karaikal
Link https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=17031
Start Date October 10, 2024 18:55
End Date

21/10/2024 ( Expired 258 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Read more
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Repair/ maint to led street lights along with replacement of lt damaged cable including allied items in south area under age e/m (es) at ge (u) e/m meerut cantt.

Repair/ maint to led street lights along with replacement of lt damaged cable including allied items in south area under age e/m (es) at ge (u) e/m meerut cantt.

Read more
Repair/ maint to led street lights along with replacement of lt damaged cable including allied items and upgradation of street light system in north area under age e/m (es) at ge (u) e/m meerut cantt.

Repair/ maint to led street lights along with replacement of lt damaged cable including allied items and upgradation of street light system in north area under age e/m (es) at ge (u) e/m meerut cantt.

Read more
Providing barricading with galvalume sheet wall to north side of stp bridge in port area.

Providing barricading with galvalume sheet wall to north side of stp bridge along the yerrigadda from ch 0 to 200m towards akp l.c in port area.

Read more
Construction of major storm water drain and widening of bt road in maripeda municipality under tufidc assistance

Construction of major storm water drains along with widening and laying of bt road both sides from kargil junction to park road and construction of storm water drain from gundepudi road to kodi yellaiah house in maripeda municipality with tufidc assistance

Read more
Design, engineering, providing, welding, laying/fixing in proper position, testing and commissioning of 630mm diameter hdpe raw water intake pipeline in nigeen lake from ashai bagh bridge up to the sump of pokhribal stage 1st.

Design, engineering, providing, welding, laying/fixing in proper position, testing and commissioning of&amp#x0d 630mm diameter hdpe raw water intake pipeline in nigeen lake from ashai bagh bridge up to the sump&amp#x0d of pokhribal stage 1st.

Read more
Construction of another patient party waiting shed along with attached shed from gynae gate to main road after demolishing the existing waiting shed in fy 2024-25 under agmc and gbp hospital, agartala

Construction of another patient party waiting shed along with attached shed from gynae gate to main road after demolishing the existing waiting shed in fy 2024-25 under agmc and gbp hospital, agartala

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise