Tender Details
Particulars | Details |
---|---|
Title |
Cement Concrete Lining Work By Paver Machine In Balance Reaches Between 91.00 Km To 103.50 Km (8.46 Km. Length) Of Rmc Cad Anta
|
Description |
Cement Concrete Lining Work By Paver Machine In Balance Reaches Between 91.00 Km To 103.50 Km (8.46 Km. Length) Of Rmc Cad Anta
|
Organisation | CAD CHAMBAL, KOTA | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 17500 |
EMD | 1.53 Crore |
Tender Value | |
Place | Anta District Baran |
Link |
AAAAAAAAAA Login to view |
Start Date | April 09, 2025 16:30 |
End Date |
12/05/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Short term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Short term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConstruction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreReconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Read moreConstruction of remain cement concrete road, footpath, storm water line etc work from gangwal bus stand to silawatpura in ward no. 68, 69 under zone no. 02
Construction of remain cement concrete road, footpath, storm water line etc work from gangwal bus stand to silawatpura in ward no. 68, 69 under zone no. 02
Read moreRehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Read moreConstruction of 1. awa to tedwa b.t. road length 2.30 km 2. otekasha to dongritola cement concrete road length- 0.85 km (pole shifting including electric work)
Construction of 1. awa to tedwa b.t. road length 2.30 km&#x0d 2. otekasha to dongritola cement concrete road length- 0.85 km (pole shifting including electric work)
Read moreConstruction of mohgaon kunde cement concrete road length- 3.60 km (pole shifting including electric work)
Construction of mohgaon kunde cement concrete road length- 3.60 km (pole shifting including electric work)
Read moreof your Industry type