Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rcc Bridge From Bachopatti To Nimahi Path In Mushahritola
|
| Description |
Construction Of Rcc Bridge From Bachopatti To Nimahi Path In Mushahritola
|
| Organisation | National Rural Road Development Agency (NRRDA) |
| Tender Id | 2023_ECBIH_127095_1 |
|
Reference Number |
STATE SCHEME(NAB)-23-PUPRI-44 |
| Tender Fee | 10000 |
| EMD | 5.16 Lakh |
| Tender Value | - |
| Place | RWD PATNA |
| Link |
View Original Tender Notice
https://pmgsytenders.gov.in |
| Start Date | August 16, 2023 23:30 |
| End Date |
Expired
23/08/2023
Expired 1152 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction work for an rcc drain, rcc slab, and interlocking path at ward no. 08, banki police outpost
Construction work for an rcc drain, rcc slab, and interlocking path at ward no. 08, banki police outpost
Read moreRepair works for rcc pipeline bridge at ch 74.2 m
Repair works for rcc pipeline bridge at ch 74.2 m
Read moreConstruction of rcc culvert in mastipur mocharam path in ward no. 22 under municipal council bodh gaya
Construction of rcc culvert in mastipur mocharam path in ward no. 22 under municipal council bodh gaya
Read moreConstruction of rcc pile foundation bridge over dhowlajhora river bearing road package no.wb21131, pkg wb21165
Construction of rcc pile foundation bridge over dhowlajhora river bearing road package no.wb21131
Read moreConstruction of hl rcc bridge between village baramurlidum and dahujor in dumka block dumka district
Construction of hl rcc bridge between village baramurlidum and dahujor in dumka block dumka district
Read moreConstruction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over suknar river at 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.
Construction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over suknar river at 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.
Read moreConstruction of rcc pile foundation bridge over kajli river bearing road package no.wb21134, pkg no wb21164
Construction of rcc pile foundation bridge over kajli river bearing road package no.wb21134
Read moreConstruction of rcc pile foundation bridge over bagjhora river bearing road package no.wb21155, pkg no wb21166
Construction of rcc pile foundation bridge over bagjhora river bearing road package no.wb21155
Read moreConstruction of rcc pile foundation bridge over moonsang river bearing road package no.wb21126, pkg no wb2198
Construction of rcc pile foundation bridge over moonsang river bearing road package no.wb21126
Read moreSlope stabilisation and soil protection works at km 34.05 (teitrung bridge), km 27.900 (shonsho bridge), km 33.250 (mayung bridge) and km 84.575 (mokaha bridge) on road tuensang-mon under 100 rcc/ 15brtf (p) sewak in nagaland state under epc mode
Slope stabilisation and soil protection works at km 34.05 (teitrung bridge), km 27.900 (shonsho bridge), km 33.250 (mayung bridge) and km 84.575 (mokaha bridge) on road tuensang-mon under 100 rcc/ 15brtf (p) sewak in nagaland state under epc mode
Read moreof your Industry type