Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 40.0 Mtr Span (2 Span 20.0 M Each) Rcc T Beam Bridge Over Sakki Nallaha And Const. Of New Lr 3.75 Mtr Wide From Ghumrai To Bsf Check Post Panjgrainan Upto Defence Line At Village Ghumrai (Under Nabard Ridf Xxx (2024 25)
|
Description |
(Including 5 Years Maintenance) Assembly Constituency And Mc Ajnala, Distt. Amritsar.
|
Organisation | Department of Agriculture | State Govt. and UT |
Tender Id | 2025_DOA_133576_1 |
Reference Number |
NABARD RIDF BRIDGE |
Tender Fee | 25900 |
EMD | 9.48 Lakh |
Tender Value | |
Place | Amritsar |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=270839 |
Start Date | January 27, 2025 18:30 |
End Date |
17/02/2025 ( Expired 62 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 24.00 mtr span rcc t-beam bridge over dhaneshwar khad at rd. 1/150 including both side approaches on okhroo to nehra via keru road
Construction of 24.00 mtr span rcc t-beam bridge over dhaneshwar khad at rd. 1/150 including both side approaches on okhroo to nehra via keru road
Read moreConstruction of 24.00 mtr span rcc t-beam bridge over dhaneshwar khad at rd. 1/150 including both side approaches on okhroo to nehra via keru road
Construction of 24.00 mtr span rcc t-beam bridge over dhaneshwar khad at rd. 1/150 including both side approaches on okhroo to nehra via keru road
Read moreConstruction of 40.0mtr span (2 span 20.0m each) rcc t-beam bridge over sakki nallaha and const. of new lr 3.75 mtr wide from ghumrai to bsf check post panjgrainan upto defence line at village ghumrai (under nabard ridf-xxx (2024-25)
(including 5 years maintenance) assembly constituency and mc ajnala, distt. amritsar.
Read moreConstruction of 24 mtr. wide road at sector-30 pinjore (existing road) near school to existing hmt gate rotary and const. of h.l bridge 2 nos. span 21.75 mtr. each connecting sector-30 and 29 pinjore and const. of rcc box type culvert sector-29 pinjo
Construction of 24 mtr. wide road at sector-30 pinjore (existing road) near school to existing hmt gate rotary and const. of h.l bridge 2 nos. span 21.75 mtr. each connecting sector-30 and 29 pinjore and const. of rcc box type culvert sector-29 pinjo
Read moreDesign and construction of 35 mtr span psc major pmt bridge with open foundation over thangeni nallah including proof check and ssi report at km 72 pt 550 on s k t t road under 94 rcc 38 brtf of project deepak in himachal pradesh
Design and construction of 35 mtr span psc major pmt bridge with open foundation over thangeni nallah including proof check and ssi report at km 72 pt 550 on s k t t road under 94 rcc 38 brtf of project deepak in himachal pradesh
Read moreCons.of43.44 m single span steel bridge over bta canal at rd 234740 x ing lr chunga to widhata at rd 2 600, including and cons. of hl bridge si. span 8 mtr normal 8.101 m skew each effective over drain x-ing mc bdr, dist bnl. w c 24-025 t- l 12 m
Cons.of43.44 m single span steel bridge over bta canal at rd 234740 x ing lr chunga to widhata at rd 2 600, including and cons. of hl bridge si. span 8 mtr normal 8.101 m skew each effective over drain x-ing mc bdr, dist bnl. w c 24-025 t- l 12 m
Read moreJob 1 construction of road from kharuni to khairiyan via chaplah, garli, deehar, makdi and chamboa sub head c.o 42.464 on span rcc t- beam bridge 3 span 13.750m each over ghaneti khad-i under nabard ridf-xxx.
Job 1 construction of road from kharuni to khairiyan via chaplah, garli, deehar, makdi and chamboa sub head c.o 42.464 on span rcc t- beam bridge 3 span 13.750m each over ghaneti khad-i under nabard ridf-xxx.
Read moreConstruction of 4 span 14 m each rcc t beam bridge over chandpur khad at rd 3705 on link road panjawar bathri road to nangal khurd chandpur t12 from km 0000 to km 5670 under pmgsyiii batch ii in distt una hp package no hp12 205 a
Construction of 4 span 14 m each rcc t beam bridge over chandpur khad at rd 3705 on link road panjawar bathri road to nangal khurd chandpur t12 from km 0000 to km 5670 under pmgsyiii batch ii in distt una hp package no hp12 205 a
Read moreConstruction of new high level bridge 5 span 20.60 mtr each replacement of old bridge slab construction of approaches over east bein near village kangniwal at km 12.8 on jalandhar jandiala nurmehal talwan road mdr 82 in distt jalandhar
Construction of new high level bridge 5 span 20.60 mtr each replacement of old bridge slab construction of approaches over east bein near village kangniwal at km 12.8 on jalandhar jandiala nurmehal talwan road mdr 82 in distt jalandhar
Read moreC/o rcc t-beam bridge 3 span(19.75 m each)over kotla kalan khad at rd 4/935on link road from baroona to phalahi (t-08) from km 0/00 to 5/00 under pmgsy-iii (batch-ii) package no. hp.11-166 a
C/o rcc t-beam bridge 3 span(19.75 m each)over kotla kalan khad at rd 4/935on link road from baroona to phalahi (t-08) from km 0/00 to 5/00 under pmgsy-iii (batch-ii) package no. hp.11-166 a
Read moreof your Industry type