Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Premium Transmission B 232 Second Stage Pinion Shaft Ratio 12.6 By 1,Premium Transmission B 232 Sec
|
Description |
|
Organisation | NMDC STEEL Limited | Ministry of Steel |
Tender Id | GEM/2024/B/5059005 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | June 17, 2024 16:07 |
End Date |
27/06/2024 ( Expired 359 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | BALAJI UDYOG | - | 12-07-2024 12:15:04 | MII | Qualified |
2 | KALYANI ENTERPRISES | - | 22-07-2024 16:23:42 | MII MSE | Disqualified |
Allotment of commercial space b-1 ground floor for un-reserved category
Allotment of 46 commercial spaces and 20 shops constructed on ground floor and 1st floor of interstate bus terminus by sscdl on premium and rent.open tender is invited for allotment for 30 year per immovable property transfer rules 2016 and on office
Read moreInput shaft bearing cover having part no 55508,1st stage gear and pinion with integral sft having p
Read more
Repairing and overhauling of by pass b/c gear box radicon make u 800, reversible and a side shuttle conveyor make radicon u 600 and rom b/c premium make cbhz 320 in pch section at sawang washery.
Repairing and overhauling of by pass b/c gear box radicon make u-800, reversible and a side shuttle conveyor make radicon u-600 and rom b/c premium make cbhz-320 in pch section at sawang washery.
Read moreTransmission,bearing with nut for manual shaft,paint,tyre with shaft,1 inch x 1 inch squrae pipe,4
Read more
Repairing of both side bull gear and pinion of propel shaft by welding and grinding , opening and fitment of propel gear box,material maching and grooming of both side propel shaft splines by welding and grinding , 19 n0s damaged tooth point of bull
Repairing of both side bull gear and pinion of propel shaft by welding and grinding , opening and fitment of propel gear box,material maching and grooming of both side propel shaft splines by welding and grinding , 19 nos damaged tooth point of bull
Read morePre-bid tie up for 765kv ais new substation package ss112t for (a) establishment of 765/400/220 kv morena ps (south of sabalgarh) (b) extension of 765/400/220 kv karera s/s associated with transmission system for evacuation of power from re projects in morena sez in madhya pradesh-phase i (2500mw) through tariff based competitive bidding (tbcb) route prior to rfp bid submission by powergrid to bpc.
Pre-bid tie up for 765kv ais new substation package ss112t for (a) establishment of 765/400/220 kv morena ps (south of sabalgarh) (b) extension of 765/400/220 kv karera s/s associated with transmission system for evacuation of power from re projects in morena sez in madhya pradesh-phase i (2500mw) through tariff based competitive bidding (tbcb) route prior to rfp bid submission by powergrid to bpc.
Read moreOnline permission for road cutting at a and b-block sukhdev vihar new delhi in ward no. 174 s, central zone sh restoration of cut by pdg. cc 1-1.5-3
Online permission for road cutting at a and b-block sukhdev vihar new delhi in ward no. 174 s, central zone sh restoration of cut by pdg. cc 1-1.5-3
Read moreTriannual maintenance contract of agc system supplied by m/s.abb in ntpc lara stage#1.
Triannual maintenance contract of agc system supplied by m/s.abb in ntpc lara stage#1.
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreSupply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Read moreof your Industry type