Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Special Repair Work Of Existing Mh/Mp Border To Jasondhi Road Section Of Nh 161 G From Km 0.00 To Km 13.80 In The State Of Madhya Pradesh
|
| Description |
Special Repair Work Of Existing Mh/Mp Border To Jasondhi Road Section Of Nh 161 G From Km 0.00 To Km 13.80 In The State Of Madhya Pradesh
|
| Organisation | Ministry of Road Transport and Highways | P5 Delhi / LWE - MoRTH | RO Bhopal - MoRTH | NH Madhya Pradesh PWD-Indore - MoRTH |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 10000 |
| EMD | 8.23 Lakh |
| Tender Value | 8.23 Crore |
| Place | |
| Link | Login to view |
| Start Date | September 22, 2026 00:25 |
| End Date |
Open
04/11/2026
23 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for preparation of dpr for widening to six lane of dhule palesnar (mp/mh border) section of nh-52 in the state of maharashtra (approx. length 89 km.) (2nd call).
Consultancy services for preparation of dpr for widening to six lane of dhule palesnar (mp/mh border) section of nh-52 in the state of maharashtra (approx. length 89 km.) (2nd call).
Read moreRisk and cost work for work of sarvardevla to pal (mp/mh border) road section of nh-347c from design chainage 81.600 km to 137.400 km (total length 55.80 km) in the state of madhya pradesh
Risk and cost work for work of sarvardevla to pal (mp/mh border) road section of nh-347c from design chainage 81.600 km to 137.400 km (total length 55.80 km) in the state of madhya pradesh
Read moreCs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Read morePerformance base maintenance contract (pbmc) of mp border chilpi to kawardha section from km 0.000 to 50.878 of nh-30 (old nh-12a) in the state of chhattisgarh.
Performance base maintenance contract (pbmc) of mp border chilpi to kawardha section from km 0.000 to 50.878 of nh-30 (old nh-12a) in the state of chhattisgarh.
Read moreSpecial repair to nh 305 sainj luhri aut road km 0.00 to km 53.00 in the state of himachal pradesh
Special repair to nh 305 sainj luhri aut road km 0.00 to km 53.00 in the state of himachal pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for widening of existing road to 4 lane from km 0.00 (numaligarh) to km 106.780 (lahorijan near assam-nagaland border) on nh-129 in the state of assam.
Consultancy services for preparation of detailed project report (dpr) for widening of existing road to 4 lane from km 0.00 (numaligarh) to km 106.780 (lahorijan near assam-nagaland border) on nh-129 in the state of assam.
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Read moreSpecial repair to bldg no t-4 (adm block) of mh pulgaon
Special repair to bldg no t-4 (adm block) of mh pulgaon
Read moreSpecial repairs to road from gate no 3 to mh rear gate under ge panagarh
Special repairs to road from gate no 3 to mh rear gate under ge panagarh
Read moreMaintenance painting of process platforms of mh, nh and bs assets from 2026 to 2031 on works basis
Maintenance painting of process platforms of mh, nh and bs assets from 2026 to 2031 on works basis
Read moreof your Industry type