Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvements To The Nandigama Jonnalagadda Road From Km 9/0 To 14/7 In Ntr District
|
| Description |
Improvements To The Nandigama Jonnalagadda Road From Km 9/0 To 14/7 In Ntr District
|
| Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
| Tender Id | 824539 |
|
Reference Number |
E NIT No. 4(04)/TO/2025-26, Dt:24.06.2025 of Superintending Engineer, (RB) Circle, Vijayawada |
| Tender Fee | 5665 |
| EMD | 1.6 Lakh |
| Tender Value | |
| Place | AP |
| Link |
View Original Tender Notice
https://tender.apeprocurement.gov.in |
| Start Date | June 26, 2025 20:30 |
| End Date |
Expired
10/07/2025
Expired 330 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreImprovement of road stretches on nh_17 from coronation bridge (km 595.20 of old nh_31) to manpong (km 597.00 )of old nh31
Improvement of road stretches on nh_17 from coronation bridge (km 595.20 of old nh_31) to manpong (km 597.00 of old n.h.31) in the district of kalimpong, west bengal.
Read moreRejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreAnti erosion work from km. 7.550 to km. 7.800 of bokta barwar bund on the right bank of river rapti in district gorakhpur
Anti erosion work from km. 7.550 to km. 7.800 of bokta barwar bund on the right bank of river rapti in district gorakhpur
Read moreConstruction of road from rd road to banpadar road in the district of koraput under mmsy for the year 2026-27
Construction of road from rd road to banpadar road in the district of koraput under mmsy for the year 2026-27
Read moreGetijharan to madhuban road
Construction of road from getijharan to madhuban road in the district of sundargarh under mmsy for the year 2026-27.
Read moreConstruction of road from chutiaposi to rengalibeda road under mmsy (mission powar) in the district of keonjhar.
Construction of road from chutiaposi to rengalibeda road under mmsy (mission powar) in the district of keonjhar.
Read moreRestoration of lane and drain and others allied works in ward no. 1, 2, 3, 4, 5, 6, 7, 8 , 9, 14, 19 and 71 and gummat gate after demolition the existing compromised structure by way of re-ecting rcc protection walls upto height of 7-0 on both sid
Restoration of lane and drain and others allied works in ward no. 1, 2, 3, 4, 5, 6, 7, 8 , 9, 14, 19 and 71 and gummat gate after demolition the existing compromised structure by way of re-ecting rcc protection walls upto height of 7-0 on both sid
Read moreConstruction of road from gopipali to baghmunda road under mmsy scheme in the district of jharsuguda for the year 2026-27
Construction of road from gopipali to baghmunda road under mmsy scheme in the district of jharsuguda for the year 2026-27
Read moreof your Industry type