Tender Details
Particulars | Details |
---|---|
Title |
Tn 1629/3 A Dated 13.05.2025 6. Work On T Junction And Road Safety At Km 1 16 23 And 32 Of The Sundarpur Nauhangpur Jasmaur Mirzapur Road In Saharanpur District
|
Description |
Work On T Junction And Road Safety At Km 1 16 23 And 32 Of The Sundarpur Nauhangpur Jasmaur Mirzapur Road In Saharanpur District
|
Organisation | Cheif Engineer Meerut Zone PWD Meerut | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 854 |
EMD | 79000 |
Tender Value | |
Place | Saharanpur |
Link |
AAAAAAAAAA Login to view |
Start Date | May 19, 2025 20:00 |
End Date |
24/05/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Road safety work on nh 128a ing from mohammadpur to gaurabadshahpur and terminating at its junction with nh 31 near jaunpur
Road safety work on nh 128a ing from mohammadpur to gaurabadshahpur and terminating at its junction with nh 31 near jaunpur in the state of uttar pradesh
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read morePeriodic renewal and 5 year routine maintenance of l036 - kumaragudi chinnavanagiri road km 0/0 - 1/750 in package no. tn 09-204r in sembanarkoil block of mayiladuthurai district under pmgsy incentive grant 2024-2025
Periodic renewal and 5 year routine maintenance of l036 - kumaragudi chinnavanagiri road km 0/0 - 1/750 in package no. tn 09-204r in sembanarkoil block of mayiladuthurai district under pmgsy incentive grant 2024-2025
Read moreGeneral improvement works bc renewal works on kanjoor naranippuzha road btw km 0 000 5 730 and eramangalam naranippuzha road btw km 0 000 1 150 of ponnani lac in malappuram district general civil work
General improvement works bc renewal works on kanjoor naranippuzha road btw km 0 000 5 730 and eramangalam naranippuzha road btw km 0 000 1 150 of ponnani lac in malappuram district general civil work
Read moreConstruction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx
Construction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx
Read moreConstruction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Read moreRequest for proposal for-apcrda-social development-outsourcing of sanitation services including solid waste management in 19 grama panchayats (four clusters) covered in crda region (excluding 6 villages merged in mangalagiri -tadepalli municipal corporation) and manual/ mechanized sweeping with 1 no of jatayu vehicle for a road length of 10 km (vvip roads) from 5/2025 to 4/2028 (36 months) on buy/hire, own and operate (boo) basis
Request for proposal for-apcrda-social development-outsourcing of sanitation services including solid waste management in 19 grama panchayats (four clusters) covered in crda region (excluding 6 villages merged in mangalagiri -tadepalli municipal corporation) and manual/ mechanized sweeping with 1 no of jatayu vehicle for a road length of 10 km (vvip roads) from 5/2025 to 4/2028 (36 months) on buy/hire, own and operate (boo) basis
Read moreWork construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district t.g. under state sector (first phase work design drawing vetting dpr preparation etc.
Work construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district t.g. under state sector (first phase work design drawing vetting dpr preparation etc.
Read moreof your Industry type