Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Channelization Of Drain Back Side Of Rest House Sh Earth Work, Disposal, 1 5 10 Kota Stone, Shuttering And Brick Work
|
| Description |
Channelization Of Drain Back Side Of Rest House Sh Earth Work, Disposal, 1 5 10 Kota Stone, Shuttering And Brick Work
|
| Organisation | Directorate of Urban Development | State Govt. and UT |
| Tender Id | 2026_UDDHP_132189_1 |
|
Reference Number |
2038-41 dt. 12.03.2026 |
| Tender Fee | 2000 |
| EMD | 12795 |
| Tender Value | - |
| Place | MC Solan |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=195459 |
| Start Date | March 21, 2026 21:30 |
| End Date |
Expired
27/03/2026
Expired 201 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mp./dev. of dhalao/dustbin into shelter near iti vivek vihar ph-i by pdg. brick work, kota stone, rcc, etc. in ward. no. 216 jhilmil shah. north zone
A
Read moreImp./dev. of dhalao/dustbin into s.k.shelter opposite b-8 vivek vihar ph-i by pdg. brick work, kota stone, rcc, etc. in ward. no. 216 jhilmil shah. north zone
A
Read moreProviding and fixing kota stone flooring at outer pessage of new and old wing hostel buildings (both sides front and back) of ug hostel in home science college in sector 10 chandigarh
Providing and fixing kota stone flooring at outer pessage of new and old wing hostel buildings (both sides front and back) of ug hostel in home science college in sector 10 chandigarh
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreKota stone flooring in staircase c-81 to c-88 and water proofing (brick bat coba),repair of ceiling plaster,wood work in kitchen, sanitary work in bathroom toilets and finishing work in c-84(new allotment),repair of ceiling plaster in staircase c-41
Kota stone flooring in staircase c-81 to c-88 and water proofing (brick bat coba),repair of ceiling plaster,wood work in kitchen, sanitary work in bathroom toilets and finishing work in c-84(new allotment),repair of ceiling plaster in staircase c-41
Read moreConstruction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-ii)
Construction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-ii)
Read moreConstruction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-i)
Construction of one (01) class room, teachers room and demonstruction room at netaji subash homeopathic hospital, renters colony, agartala, tripura during the year 2026-27/ sh earth work, brick work, rcc work, tiles, pvc ceiling etc. (phase-i)
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type