Tender Details
Particulars | Details |
---|---|
Title |
High Pressure Fire Fighting Hose With Delivery Couplings As Per Is 14933
|
Description |
|
Organisation | COAL INDIA LIMITED | Ministry of Coal |
Tender Id | GEM/2025/B/6066790 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | March 19, 2025 14:54 |
End Date |
09/04/2025 ( Expired 14 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of 38 nos. airfield crash fire tender (acfts) / aircraft rescue and fire fighting vehicles (arffvs) of 10,000 liters water tank capacity with 08 years comprehensive annual maintenance contract after 02 years of defect liability period
Supply of 38 nos. airfield crash fire tender (acfts) / aircraft rescue and fire fighting vehicles (arffvs) of 10,000 liters water tank capacity with 08 years comprehensive annual maintenance contract after 02 years of defect liability period
Read moreHigh purity magnesium ingots of grade i quality as per annexure
High purity magnesium ingots 200 mt of grade i quality as per annexure
Read moreDesign, fabrication, supply, i & c of straightening machine with auxiliary systems as per annexure
Read more
Epoxy primer with th as per bs2x33 and paint bs2x34
Epoxy primer with th as per bs2x33 and paint bs2x34
Read moreFencing with r.c.c. pole of length 2 m provide 2m c/c. the rate for barbed wire and rcc pole with fixing should be quoted seperately as per drawing.
Fencing with r.c.c. pole of length 2 m provide 2m c/c. the rate for barbed wire and rcc pole with fixing should be quoted seperately as per drawing.
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Read moreof your Industry type