Tender Details
Particulars | Details |
---|---|
Title |
M/O W/S (Two Year Running Operation Of Ugr And T.W In Network Sector 151 To 154) Noida.
|
Description |
M/O W/S (Two Year Running Operation Of Ugr And T.W In Network Sector 151 To 154) Noida.
|
Organisation | New Okla Industrial Development Authority | State Govt. and UT |
Tender Id | 2024_NOIDA_986065_1 |
Reference Number |
45/SM (JAL)-I/ET/2024-25 |
Tender Fee | 2832 |
EMD | 1.11 Lakh |
Tender Value | |
Place | NOIDA |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1738303 |
Start Date | December 27, 2024 18:00 |
End Date |
08/01/2025 ( Expired 134 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreDevelopment, operation and maintenance of wayside amenities on lease basis (5 o-m sites) (nh-752d/ ujjain-badnawar/29-050/ lhs/pipliyragho/mp)
Development, operation and maintenance of wayside amenities on lease basis (5 o-m sites) (nh-752d/ ujjain-badnawar/29-050/ lhs/pipliyragho/mp)
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreDevelopment, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/gorakhpur/up
Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/gorakhpur-kushinagar /285-177/ lhs/jagdishpur/uttar pradesh
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreO n m of 4laning of kutchery chowk ranchi piska more bijupara sec of nh75 (km.3.560 to km. 55.000)piska more palma section of nh23 km.3.600 to km.26.000 excluding 1.17 km l 72.67 km on pbmc in the state of jharkhand.
O n m of 4laning of kutchery chowk ranchi piska more bijupara sec of nh75 (km.3.560 to km. 55.000)piska more palma section of nh23 km.3.600 to km.26.000 excluding 1.17 km l 72.67 km on pbmc in the state of jharkhand.
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreof your Industry type