Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Carrying Out Structural Stability Feasibility Study For The Proposed Installation Of Data Centre Over The First Floor Slab Of Existing Old Physics And Chemistry Lab Building In The Premises Of Nano Building At Bharat Electronics Ltd Jalahalli Ban
|
| Description |
Carrying Out Structural Stability Feasibility Study For The Proposed Installation Of Data Centre Over The First Floor Slab Of Existing Old Physics And Chemistry Lab Building In The Premises Of Nano Building At Bharat Electronics Ltd Jalahalli Ban
|
| Organisation | Bharat Electronics Limited | Public Sector Undertakings |
| Tender Id | 2025_BEL_98107_1 |
|
Reference Number |
Carrying Out Structural Stability |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Purchase ES BEL |
| Link |
View Original Tender Notice
eprocurebelgsl.nic.in?page=FrontEndTenderDetailsExternal&service=page&tnid=107665 |
| Start Date | September 10, 2025 20:30 |
| End Date |
Expired
19/09/2025
Expired 392 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for assessment of load carrying capacity and structural soundness of existing bridges, including bearings, expansion joints, and allied components, along with feasibility study for transportation and maneuverability of over
Dimensional consignments (ht-03) of 12-axle configuration carrying approx 100 tonne wire ropes on bridge approaches and curves for the kedarnath and hemkund sahib ropeway projects on rudraprayag-sonprayag (nh-107) and rishikesh-govindghat (nh-07
Read moreStudy work for stability of bhimtal dam as suggested by d.s.r.p. structural study
Study work for stability of bhimtal dam as suggested by d.s.r.p. structural study
Read moreStudy work for stability of bhimtal dam as suggested by d.s.r.p. non-structural
Study work for stability of bhimtal dam as suggested by d.s.r.p. non-structural
Read moreProvision of structural stability test and feasibility assessment of t-2 hanger at ins venduruthy, naval base kochi.
As per boq and tender document
Read moreProvn of structural stability test and feasibility assessment of mess annex bldg (p-420) at snc(o) mess naval base kochi
Structural consultancy
Read moreProvn of structural stability test and feasibility assessment of mess annex bldg p 420 at snc o mess naval base kochi
As per boq and tender document
Read moreProviding island table, laboratory sink, shelves and cupboards under the workbenches in the newly built chemistry lab, physics lab and faculty room of department of nano science and technology
Providing island table, laboratory sink, shelves and cupboards under the workbenches in the newly built chemistry lab, physics lab and faculty room of department of nano science and technology
Read moreStability analysis and condition assessment of concrete in the rc structural elements of the old chemistry building g plus 2 floor and existing bath house at swimming pool at iit madras at iit madras
Stability analysis and condition assessment of concrete in the rc structural elements of the old chemistry building g plus 2 floor and existing bath house at swimming pool at iit madras at iit madras
Read moreConsultancy services to conduct feasibility study, preparation of detailed estimate, relevant designs and drawings rcc and masonry, architectural, structural design, mep and erection along with all internal electrical, water supply and sanitary fitti
Consultancy services to conduct feasibility study, preparation of detailed estimate, relevant designs and drawings rcc and masonry, architectural, structural design, mep and erection along with all internal electrical, water supply and sanitary fitti
Read moreCorridor work next to the newly constructed rooms on the first floor above the physics and chemistry laboratories in the institute of dr ambedkar institute of technology for persons with disabilities uttar pradesh kanpur
Corridor work next to the newly constructed rooms on the first floor above the physics and chemistry laboratories in the institute of dr ambedkar institute of technology for persons with disabilities uttar pradesh kanpur
Read moreof your Industry type