Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Special Repair Work Of Railway Over Bridge Rob Located At Km 1 Of Daurala Barnawa Odr In Meerut District
|
| Description |
Special Repair Work Of Railway Over Bridge Rob Located At Km 1 Of Daurala Barnawa Odr In Meerut District
|
| Organisation | Cheif Engineer Meerut Zone PWD Meerut | State Govt. and UT |
| Tender Id | 2024_CEMRT_979938_1 |
|
Reference Number |
1861/3A DT 16-11-2024 |
| Tender Fee | 944 |
| EMD | 3.2 Lakh |
| Tender Value | - |
| Place | EE CD PWD MEERUT |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1723960 |
| Start Date | December 04, 2024 00:00 |
| End Date |
Expired
10/12/2024
Expired 674 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Special repair of road over daulatabad railway over bridge, gurugram.
Special repair of road over daulatabad railway over bridge, gurugram.
Read moreConstruction of foot over bridge (fob) at digha railway station.
Construction of foot over bridge (fob) at digha railway station.
Read moreReconstruction work of the bridge located at km 1 of the bulandshahr tajpur road (odr) in district bulandshahr
Reconstruction work of the bridge located at km 1 of the bulandshahr tajpur road (odr) in district bulandshahr
Read morePreparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway
Preparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway
Read moreProvision of 3.0 meter wide foot over bridge (fob) at sariabanjara (sbj) railway station.
Provision of 3.0 meter wide foot over bridge (fob) at sariabanjara (sbj) railway station.
Read moreConstruction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreConstruction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Read moreConstruction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Read moreShifting of departmental pipe line and replacement of air valve near lalgarh railway over bridge under phed pdr sub dn ist bikaner
Shifting of departmental pipe line and replacement of air valve near lalgarh railway over bridge under phed pdr sub dn ist bikaner
Read moreDeposit southern railway doubling of railway track utility shifting at kunjalammoodu re alignment of existing sewer main line from chainage 222200 to chainage 222300 and laying of di k9 pipe through the proposed railway over bridge at kunjalammoodu
Deposit southern railway doubling of railway track utility shifting at kunjalammoodu re alignment of existing sewer main line from chainage 222200 to chainage 222300 and laying of di k9 pipe through the proposed railway over bridge at kunjalammoodu
Read moreof your Industry type