Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Boundary Wall Of Shamshan Ghat At Village Rehan Kheri, Block Bhuna, District Fatehabad
|
Description |
Construction Of Boundary Wall Of Shamshan Ghat At Village Rehan Kheri, Block Bhuna, District Fatehabad
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_298011_1 |
Reference Number |
20233450FB40 C6B8 4F43 9F84 2BD9E66C7B54692DEV |
Tender Fee | 1000 |
EMD | 42150 |
Tender Value | |
Place | Executive Engineer Fatehabad |
Link | https://etenders.hry.nic.in |
Start Date | July 18, 2023 21:30 |
End Date |
28/07/2023 ( Expired 689 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreRepair and maintenance of primary health care centre at mimi village of kiphire district in nagalan
Repair and maintenance of primary health care centre at mimi village of kiphire district in nagalan
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreConstruction of boundary wall at muktidham at ward no 22
Construction of boundary wall at muktidham at ward no 22
Read moreConstruction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Read moreof your Industry type