Tender Details
Particulars | Details |
---|---|
Title |
Performance Evaluation Of A Typical Small Gas Turbine Simulated Rotor With Curvic Coupling
|
Description |
Performance Evaluation Of A Typical Small Gas Turbine Simulated Rotor With Curvic Coupling
|
Organisation | Department of Defence Research and Development | Central Govt. Ministry/Department |
Tender Id | 2024_DRDO_672680_1 |
Reference Number |
GTRE/25ATT016/CMS II |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | GTRE DRDO |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=752068 |
Start Date | September 06, 2024 22:45 |
End Date |
24/09/2024 ( Expired 262 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jp/b862-000-eb-t-0020/1021 - 220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreConstruction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Read moreRejuvenation of ld gas holder 1 with seal changing complete in all respects
Rejuvenation of ld gas holder 1 with seal changing complete in all respects
Read moreLumpsum price for supply of fixed gas detector system with controller and other accessories as per
Read more
Procurement of half coupling maintenance kit with grease and half coupling covers
Procurement of half coupling maintenance kit with grease and half coupling covers
Read moreSupply, installation, commissioning and succesfull trial of mill drive with 450kw ac vfd motor, planetary gear box and rope less coupling with all accessories along with complete automation before start of season 2025-26
Supply, installation, commissioning and succesfull trial of mill drive with 450kw ac vfd motor, planetary gear box and rope less coupling with all accessories along with complete automation before start of season 2025-26
Read moreSupply and construction of devp of lower maratha ground (05 x ctb with bio-toilet, 02 x pathway with roof, 02 x cook house cum dining hall, 04 x small store shelter and 02 x medium store shelter (s and c) (cow)
Supply and construction of devp of lower maratha ground (05 x ctb with bio-toilet, 02 x pathway with roof, 02 x cook house cum dining hall, 04 x small store shelter and 02 x medium store shelter as all specified in technical specification
Read moreSupply and construction of devp of lower maratha ground (05 x ctb with bio-toilet, 03 x hard standing, 02 x pathway with roof, 02 x cook house cum dining hall, 04 x small store shelter, 02 x medium store shelter and 01 x sentry post (s and c) (cow)
Supply and construction of devp of lower maratha ground (05 x ctb with bio-toilet, 03 x hs, 02 x pathway with roof, 02 x ch cum dh, 04 x small store shelter, 02 x medium store shelter and 01 x sp as all specified in technical specifications
Read moreHiring services of senior field engineer and technical manpower with tools and tackles for major overhauling of 03 nos. nuovo pignone make gas lift compressor of cpf gandhar, ankleshwar asset
Hiring services of senior field engineer and technical manpower with tools and tackles for major overhauling of 03 nos. nuovo pignone make gas lift compressor of cpf gandhar, ankleshwar asset
Read moreAnnual maintenance contract (mechanical) of boiler, turbine with their auxiliaries for tpp and unit 9.
Annual maintenance contract (mechanical) of boiler, turbine with their auxiliaries for tpp and unit 9.
Read moreof your Industry type