Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply Of Materials For Construction Of Cement Concrete Drain And Rapata At Gp Bordi Tq Akot Dist Akola
|
Description |
Supply Of Materials For Construction Of Cement Concrete Drain And Rapata At Gp Bordi Tq Akot Dist Akola&Amp#X0d
&Amp#X0d
Providing Cement Bags&Amp#X0d
Work Head 15 Finance Commission 2023 24&Amp#X0d
|
Organisation | RDD-CEO-AKOLA | State Govt. and UT |
Tender Id | 2024_AKOLA_1045766_1 |
Reference Number |
E-TENDER/5478/ Bordi/2023-24 |
Tender Fee | 300 |
EMD | 3000 |
Tender Value | |
Place | Grampanchayat Bordi |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1826294 |
Start Date | June 27, 2024 20:55 |
End Date |
03/07/2024 ( Expired 346 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign and construction of civil, structural, architecture, mep, hvac, lifts, landscaping and all associated works for establishment of integrated bus terminal cum commercial office development at vadapalani bus depot
Design and construction of civil, structural, architecture, mep, hvac, lifts, landscaping and all associated works for establishment of integrated bus terminal cum commercial office development at vadapalani bus depot
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreConstruction of rcc cable trench, supply and laying of ht cable for crude oil import terminal of m/s numaligarh refinery limited.
Construction of rcc cable
 trench, supply and laying of
 ht cable for crude oil
 import terminal of m/s
 numaligarh refinery
 limited.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreSupply of 3d scanner and 3d printer along with raw materials for 3d printer
Supply of 3d scanner and 3d printer along with raw materials for 3d printer
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreof your Industry type