Tender Details

Particulars Details
Title
Enhancement Of Load From 35 Kw To 90 Kw Spp Load Along With Metering Arrangement Of Basta Chc At Basta
Description
Enhancement Of Load From 35 Kw To 90 Kw Spp Load Along With Metering Arrangement Of Basta Chc At Basta
Organisation Government of Odisha
Tender Id 2023_CERWI_92273_3
Reference
Number
EERWELBBSR 11/ 2023-24
Tender Fee 6000
EMD 12978
Tender Value -
Place E. E. R.W EL.DIVN.BBSR At- Divn. Complex Rasulgarh
Link
View Original Tender Notice

https://tendersodisha.gov.in

Start Date August 16, 2023 17:30
End Date
Expired 24/08/2023

Expired 1146 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Enhancement of load from 35kw to 90kw spp load along with metering arrangement of basta chc at basta

Enhancement of load from 35kw to 90kw spp load along with metering arrangement of basta chc at basta or-18-186/pmgsy-iii (b-ii) to near by saftey place due to improvement of road

Read more
Installation of 11/0.4kv 500 kva plinth mounted sub-station and installation of ht metering unit for power supply to the 230kw spp load for govt. iti, talcher for the year 2023-24

Installation of 11/0.4kv 500 kva plinth mounted sub-station and installation of ht metering unit for power supply to the 230kw spp load for govt. iti, talcher for the year 2023-24

Read more
Supply ,erection, testing and commissioning of 400 kva distribution substation along with creation of tapping point for load enhancement in favour of m/s century polymers pvt. ltd. bandurakh

Supply ,erection, testing an commissioning of 400 kva distribution substation along with creation of tapping point for load enhancement in favour of m/s century polymers pvt. ltd. bandurakh within the jurisdiction of electric division vijaypur, jpdcl

Read more
Total 100 kw 25 kw x 4 nos. enhancement of grid connected solar pv power plant under roof top net metering along with dc power optimizer and synchronising with existing solar plant already in operation at koradi shopping complex, district nagpur

Total 100 kw 25 kw x 4 nos. enhancement of grid connected solar pv power plant under roof top net metering along with dc power optimizer and synchronising with existing solar plant already in operation at koradi shopping complex, district nagpur

Read more
Yearly operation maintenance of existing 2378 nos of house service connection with metering arrangement along with water meter reading periodic ferrule cleaning within one year operation of pumps at zone-ii dtw pump houses under raiganj municipalityi

Yearly operation maintenance of existing 2378 nos of house service connection with metering arrangement along with water meter reading periodic ferrule cleaning within one year operation of pumps at zone-ii dtw pump houses under raiganj municipality

Read more
Providing survey supply design erection testing commissioning of 11 kv ht line to proposed 100kva dtr along with ctpt metering unit for prov. sop to fis malwana tube well noii near four lane for 60hp/44.46kw load in e section gagal under nerchowk

Providing survey supply design erection testing commissioning of 11 kv ht line to proposed 100kva dtr along with ctpt metering unit for prov. sop to fis malwana tube well noii near four lane for 60hp/44.46kw load in e section gagal under nerchowk

Read more
Providing survey supply design erection testing commissioning of 22 kv ht line to proposed 100kva dtr along with ct/pt metering equipment for providing sop to fis chhaprohal ghatta near samshan ghat for 25hp/18.65kw load in e section gagal under n

Providing survey supply design erection testing commissioning of 22 kv ht line to proposed 100kva dtr along with ct/pt metering equipment for providing sop to fis chhaprohal ghatta near samshan ghat for 25hp/18.65kw load in e section gagal under n

Read more
aug. of 25 kva to 63 kva s/stn. barmana along with provding 3 phase lt line by prov. lt cable to release the 3 phase connection insteased of 1 phase due to enhancement of load from 5kw for mobile towerof sumit digital in section beri esd no.1

aug. of 25 kva to 63 kva s/stn. barmana along with provding 3 phase lt line by prov. lt cable to release the 3 phase connection insteased of 1 phase due to enhancement of load from 5kw for mobile towerof sumit digital in section beri esd no.1

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise