Tender Details
About Tender
🏗️ Epc Au Ii (39 B) Project Bid Invitation 🛣️🚧 The Maharashtra State Infrastructure Development Corporation (Mahashakti) Invites Bids From Experienced Epc Contractors For The Epc Au Ii (39 B) Project, Which Involves The Improvement Of State Highway (Sh) 57 From Tintraj To Dandegaon, Devgaon Gosaviwadi, Khandeshwarwadi, Ratnapur, Anala Kandari, Kumbephal, Pachpimpala, Paranda, And Mungshi In Chhatrapati Sambhaji Nagar. 📅 Bid Submission Deadline: May 03, 2024, 5:00 Pm Tender Fee: Inr 5900 Emd: Inr 23,47,680 Interested Bidders Must Demonstrate Their Capability To Undertake Complex Infrastructure Projects And Adhere To The Project's Timelines And Quality Standards. Detailed Project Plans, Financial Bids, And Technical Proposals Are Required. Keywords: Epc Project, Infrastructure Development, Maharashtra State Infrastructure Development Corporation, Highway Improvement, Government Tender, Bid, Engineering Procurement Construction, Chhatrapati Sambhaji NagarParticulars | Details |
---|---|
Title |
Epc Au Ii (37 C) Improvement To Shivur To Bangala District Border (Nadgaon) Sh 26 Km 184/500 To 162/500 And Shrirampur Vaijapur Road Sh 51 Km 18/500 To 38/500 On Epc Mode
|
Description |
Epc Au Ii (37 C) Improvement To Shivur To Bangala District Border (Nadgaon) Sh 26 Km &Amp#X0d
184/500 To 162/500 And Shrirampur Vaijapur Road Sh 51 Km 18/500 To 38/500 On Epc Mode
|
Organisation | Maharashtra State Infrastructure Development Corporation | State Govt. and UT |
Tender Id | 2024_MSIDC_1031546_1 |
Reference Number |
E-TENDER NOTICE NO.10 OF 2023-2024 |
Tender Fee | 5900 |
EMD | 1.06 Crore |
Tender Value | |
Place | Chhatrapati Sambhaji Nagar |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1804224 |
Start Date | April 17, 2024 20:30 |
End Date |
10/05/2024 ( Expired 370 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreImprovement strengthening of road from burighat to sermunii in tripura length15.862 km under nesidsroads on engineering procurement construction epc mode
Improvement strengthening of road from burighat to sermunii in tripura length15.862 km under nesidsroads on engineering procurement construction epc mode
Read moreImprovement to sahastrakund islapur hudi chikhli apparaopeth to telangana border sh-465 km. 0/00 to 4/500, 10/00 to 14/00, 18/00 to 22/00 tq. kinwat dist. nanded (under crf)
Improvement to sahastrakund islapur hudi chikhli apparaopeth to telangana border sh-465 km. 0/00 to 4/500, 10/00 to 14/00, 18/00 to 22/00 tq. kinwat dist. nanded (under crf)
Read moreImprovement strengthening of road from burighat to sermunii in tripura length 15862 km under nesidsroads on engineering procurement construction epc mode
Improvement strengthening of road from burighat to sermunii in tripura length 15862 km under nesidsroads on engineering procurement construction epc mode
Read moreStrengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore - villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu
Read moreImprovement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Improvement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Read moreImprovement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534) (from ratia fatehabad road) (balance 33 kv material for rd- 3)
Improvement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534) (from ratia fatehabad road) (balance 33 kv material for rd- 3)
Read moreImprovement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534 (from ratia fatehabad road) (balance 33 kv material of shifting for rd- 5)
Improvement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534 (from ratia fatehabad road) (balance 33 kv material of shifting for rd- 5)
Read moreImprovement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534 (from ratia fatehabad road) (balance 33 kv material of shifting for rd-4...
Improvement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534 (from ratia fatehabad road) (balance 33 kv material of shifting for rd- 4)
Read moreof your Industry type