Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair / Renovation And Dismantling Of Existing Choked Drain B.W.O Rising And Laying Of New Slab After Dismantling Of Existing Slab Behind Raj Palace Hotel Near Usmanabad At Mc Kupwara
|
| Description |
Repair / Renovation And Dismantling Of Existing Choked Drain B.W.O Rising And Laying Of New Slab After Dismantling Of Existing Slab Behind Raj Palace Hotel Near Usmanabad At Mc Kupwara
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWDJK_272044_1 |
|
Reference Number |
NIT No. 52 of 2024-25 |
| Tender Fee | 200 |
| EMD | 8400 |
| Tender Value | - |
| Place | MC Kupwara |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840729 |
| Start Date | February 08, 2025 14:30 |
| End Date |
Expired
14/02/2025
Expired 607 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing and fixing of paver block after dismantling of existing paver block on footpath in sector 30 and 20 , chandigarh.
Providing and fixing of paver block after dismantling of existing paver block on footpath in sector 30 and 20 , chandigarh.
Read moreRaising of the kerb and channel after dismantling damaged existing kerb channels on kalka road madhya marg from jn43 to ut boundary chandigarh
Raising of the kerb and channel after dismantling damaged existing kerb channels on kalka road madhya marg from jn43 to ut boundary chandigarh
Read moreTtps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul
Ttps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreDesilting and cleaning of the drains after dismantling of cover slab and refixing with precast slabs after the work under halisahar municipality
Desilting and cleaning of the drains after dismantling of cover slab and refixing with precast slabs after the work under halisahar municipality
Read moretiruppur corporation_ dismantling existing drain slab and providing readymade slab for ksc school street in ward no. 51
dismantling existing drain slab and providing readymade slab for ksc school street in ward no. 51
Read moreModification of existing window as per chute after dismantling, shifting of outdoor unit split ac
Read more
Modification of existing window as per chute after dismantling, shifting of outdoor unit split ac
Read more
Construction of 2500 mt capacity godowns (without roofing) with e.i. work, manager office after dismantling of existing manager office, septic tank, injection well, washroom, new boundary wall after dismantling of existing boundary wall at ateli.
Construction of 2500 mt capacity godowns (without roofing) with e.i. work, manager office&#x0d after dismantling of existing manager office, septic tank, injection well, washroom, new&#x0d boundary wall after dismantling of existing boundary wall at ateli.
Read moreRecovery of serviceable / unserviceable material after dismantling of existing riicostore and cwr at office campus makrana
Recovery of serviceable/unserviceablematerial after dismantling of existing riicostore and cwr at office campus makrana
Read moreof your Industry type