Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Balance Earthwork, Structures, Lining And Allied Works In Deep Cut Portion Of Nakshi Branch Canal In K.M. 0 To 12.50 Of Mokhabardi Lift Irrigation Scheme.
|
Description |
Construction Of Balance Earthwork, Structures, Lining And Allied Works In Deep Cut Portion Of Nakshi Branch Canal In K.M. 0 To 12.50 Of Mokhabardi Lift Irrigation Scheme. (2nd Call)
|
Organisation | Government of Maharashtra |
Tender Id | 2023_CEWRD_931625_1 |
Reference Number |
Tender Notice No 03/2023-24 (Second Call) |
Tender Fee | 2360 |
EMD | 5.14 Lakh |
Tender Value | |
Place | Bhiwapur (Online) |
Link | https://mahatenders.gov.in |
Start Date | August 03, 2023 15:30 |
End Date |
14/08/2023 ( Expired 692 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india
World bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiii)
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply works (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, ai based cwims and cmms and 7 years of om for entire water supply (except intake to wtp) on dbo basis in amaravati
Survey, investigation, design, construction of balance works, testing, commissioning of water supply works (clear water pump house (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, a.i based centralized water information management system (cwims) computerized maintenance management system (cmms) and 7 years om for entire water supply (except intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiv)
Read moreReexcavation of surface flow minor irrigation scheme (sfmis) and allied protection works from edor bundh kali mandir to satpota at joypur gp amta ii dev block in the district of howrah under core sector 2025-26 programme
Reexcavation of surface flow minor irrigation scheme (sfmis) and allied protection works from edor bundh kali mandir to satpota at joypur gp amta ii dev block in the district of howrah under core sector 2025-26 programme
Read moreRehabilitation and modernization of jhanjharpur branch canal from km 0.00 to km 42.06 of western kosi irrigation scheme under bwsimp
Rehabilitation and modernization of jhanjharpur branch canal from km 0.00 to km 42.06 of western kosi irrigation scheme under bwsimp
Read moreConstruction of link road pirsaluhi (kangra) to kitpal (hamirpur) km 0/000 to 5/740 in district kangra (hp)(sh formation cutting, passing places,c/o r/walls, cd works, p/l gsb,wmm,tarring work,side drain and parapets, , road sign board, c/o 102.511 m
Construction of link road pirsaluhi (kangra) to kitpal (hamirpur) km 0/000 to 5/740 in district kangra (hp)(sh formation cutting, passing places,c/o r/walls, cd works, p/l gsb,wmm,tarring work,side drain and parapets, , road sign board, c/o 102.511 m
Read moreConstruction execution of micro irrigation scheme for sonegaon stage i rd 20580 m on wadala branch of mokhabardi lift irrigation scheme for irrigation of 1718 ha. culturable command area (cca) with pipe distribution network and micro irrigation syste
Construction execution of micro irrigation scheme for sonegaon stage i rd 20580 m on wadala branch of mokhabardi lift irrigation scheme for irrigation of 1718 ha. culturable command area (cca) with pipe distribution network and micro irrigation syste
Read moreConstruction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire
Construction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire
Read moreRepair and replacement of paver tiles in dammege areas and painting of fire line from ad cut out to v i p gate and other allied works within the compound of v y b k during 2025 26
Repair and replacement of paver tiles in dammege areas and painting of fire line from ad cut out to v i p gate and other allied works within the compound of v y b k during 2025 26
Read moreof your Industry type