Tender Details
About Tender
🏗️ Invitation For Bids: Construction Project On Mokhabardi Lift Irrigation Scheme 🌱🚧 The Ce Water Resources Department, Gosikurda Project, Nagpur, Under The State Government And Union Territories, Invites Bids For The Construction Of Balance Earthwork, Structures, And Canal Side Drains On The Sathagaon Distributory From 0 To 8.60 K.M., Off Taking From R.D. 37980 M. On The Main Canal Of The Mokhabardi Lift Irrigation Scheme. 📅 Bid Submission Deadline: April 05, 2024, 5:45 Pm Tender Fee: Inr 5900 Emd: Inr 287000 Interested Contractors Must Possess The Necessary Qualifications And Experience In Civil Construction Projects. Bids Should Include Detailed Project Plans, Cost Estimates, And Timelines For Completion, Adhering To The Specifications Outlined In The Tender Documents. Keywords: Construction, Earthwork, Structures, Canal Side Drains, Mokhabardi Lift Irrigation Scheme, Water Resources Department, Gosikurda Project, Nagpur, Government Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Construction Of Balance Earthwork, Structures And Canal Side Drains On Sathagaon Distributory From 0 To 8.60 K.M. Offtaking From R.D. 37980 M. On Main Canal Of Mokhabardi Lift Irrigation Scheme.
|
Description |
Construction Of Balance Earthwork, Structures And Canal Side Drains On Sathagaon Distributory From 0 To 8.60 K.M. Offtaking From R.D. 37980 M. On Main Canal Of Mokhabardi Lift Irrigation Scheme.
|
Organisation | CE Water Resources Department Gosikurda Project Nagpur | State Govt. and UT |
Tender Id | 2024_CEWRD_1035729_1 |
Reference Number |
Notice No 17/ 2023-24 |
Tender Fee | 5900 |
EMD | 2.87 Lakh |
Tender Value | |
Place | Sathagaon Distributory |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1810927 |
Start Date | March 15, 2024 15:30 |
End Date |
05/04/2024 ( Expired 404 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreConstruction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Read moreMu.- construction of cc road from pappu prajapatis house to narayan babas house, from awadhesh pratap singhs house to pappu yadavs house in khushipura ward 21 and construction of rcc slab on drain. (length 88 m and width 2.10 m)
Mu.- construction of cc road from pappu prajapatis house to narayan babas house, from awadhesh pratap singhs house to pappu yadavs house in khushipura ward 21 and construction of rcc slab on drain. (length 88 m and width 2.10 m)&#x0d
Read moreConstruction work of c.c. road from madan yadavs house to main road in ward 07, pathanpura 03. (length 144 m and width 5 m)
Construction work of c.c. road from madan yadavs house to main road in ward 07, pathanpura 03. (length 144 m and width 5 m)&#x0d
Read moreConstruction work of c.c. from jitendras house to main road in ward 09, mianpura atrauli. (length 87 m and width 3.60 m)
Construction work of c.c. from jitendras house to main road in ward 09, mianpura atrauli. (length 87 m and width 3.60 m)&#x0d
Read moreConstruction of rcc lined canal with retaining wall and rcc solid bridge for bukcle canel chaninage from 7140 m to 7490 m fci godown
Construction of rcc lined canal with retaining wall and rcc solid bridge for bukcle canel chaninage from 7140 m to 7490 m fci godown
Read moreConstruction of lined canal with retaining wall and stone pitching for bukcle canel chaninage from 0 to 55 m disposal point
Construction of lined canal with retaining wall and stone pitching for bukcle canel chaninage from 0 to 55 m disposal point
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreConstruction of distribution system for 4924.04 ha. of cca including command area development (cad) of salandi left main canal from rd 49.810 km to 59.970 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 4924.04 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 49.810 km to 59.970 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreM/r to regulator gate and structure including canal banks in connection with kharif irrigation 2024 from ch.1300 to ch. 1392 of mdbc under eroali (i) section of kuli irrigation sub-divn. under m.n.c division during the period july 2025 to oct 2025
M/r to regulator gate and structure including canal banks in connection with kharif irrigation 2024 from ch.1300 to ch. 1392 of mdbc under eroali (i) section of kuli irrigation sub-divn. under m.n.c division during the period july 2025 to oct 2025
Read moreof your Industry type