Tender Details
Particulars | Details |
---|---|
Title |
Work Of Shifting Single Pole/Double Pole/Conductor/Distribution Transformer And Other Electrical Material Of 11 Kv Lines Obstructing The Road To Another Place Is To Be Done Through An External Agency
|
Description |
Work Of Shifting Single Pole/Double Pole/Conductor/Distribution Transformer And Other Electrical Material Of 11 Kv Lines Obstructing The Road To Another Place Is To Be Done Through An External Agency
|
Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 3540 |
EMD | 44500 |
Tender Value | |
Place | UNDER THE AREA OF EDD CHARTHAWAL MZN |
Link |
AAAAAAAAAA Login to view |
Start Date | May 15, 2025 23:30 |
End Date |
22/05/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of shifting single pole/double pole/four pole/conductor and other electrical material of 33 kv and lt lines obstructing the road to another place is to be done through an external agency.
Work of shifting single pole/double pole/four pole/conductor and other electrical material of 33 kv and lt lines obstructing the road to another place is to be done through an external agency.
Read moreWork of electrification for the buildings constructed under pradhan mantri awas yojana bhopa road muzaffarnagar is to be done through an external agency.
Work of electrification for the buildings constructed under pradhan mantri awas yojana bhopa road muzaffarnagar is to be done through an external agency.
Read moreWork of shifting single pole/double pole/conductor/distribution transformer and other electrical material of 11 kv lines obstructing the road to another place is to be done through an external agency
Work of shifting single pole/double pole/conductor/distribution transformer and other electrical material of 11 kv lines obstructing the road to another place is to be done through an external agency
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreMaintenance work of associated ht/lt lines, replacement of idf meter and disconnection of defaulter consumers (from 01.06.2025 to 31.03.2026) of 33/11 kv s/s jakholi under edsd sumari bhardar through outer agency against o and m head
Maintenance work of associated ht/lt lines, replacement of idf meter and disconnection of defaulter consumers (from 01.06.2025 to 31.03.2026) of 33/11 kv s/s jakholi under edsd sumari bhardar through outer agency against o and m head
Read moreMaintenance work of associated ht/lt lines, replacement of idf meter and disconnection of defaulter consumers (from 01.06.2025 to 31.3.2026) of 33/11 kv s/s guptkashi and ukhimath under edd rudraprayag through outer agency against o and m head
Maintenance work of associated ht/lt lines, replacement of idf meter and disconnection of defaulter consumers (from 01.06.2025 to 31.3.2026) of 33/11 kv s/s guptkashi and ukhimath under edd rudraprayag through outer agency against &#x0d o and m head&#x0d
Read morePurchase of hardware and bus bar material for 400kv (assorted type) as per requirement of specification (nigam design) required for augmentation work of 500 mva transformer to be installed at 400 kv gss heerapura through single source procurement
Purchase of hardware and bus bar material for 400kv (assorted type) as per requirement of specification (nigam design) required for augmentation work of 500 mva transformer to be installed at 400 kv gss heerapura through single source procurement
Read moreMaintenance work of associated ht/lt lines, replacement of idf meters and disconnection of defaulter consumers (from 01-04-2025 to 31-03-2026) of 33/11 kv sub stations pokhri in edsd pokhri under edd gopeshwar through outer agency against oandm head
Maintenance work of associated ht/lt lines, replacement of idf meters and disconnection of defaulter consumers (from 01-04-2025 to 31-03-2026) of 33/11 kv sub stations pokhri in edsd pokhri under edd gopeshwar through outer agency against oandm head
Read moreMaintenance work of associated ht/lt lines and disconnection of defaulter consumers in shri badrinath dham to shri hemkund sahib (from 01-04-2025 to 31-03-2026) of electrical distribution sub division, joshimath under edd gopeshwar through outer ag
Maintenance work of associated ht/lt lines and disconnection of defaulter consumers in shri badrinath dham to shri hemkund sahib (from 01-04-2025 to 31-03-2026) of electrical distribution sub division, joshimath under edd gopeshwar through outer ag
Read moreMaintenance work of associated ht/lt lines and revnew relization work (from 01-04-2025 to 31-03-2026) of electrical distribution sub division, chamoli, joshimath and pokhari under edd gopeshwar through outer agency against oandm head
Maintenance work of associated ht/lt lines and revnew relization work (from 01-04-2025 to 31-03-2026) of electrical distribution sub division, chamoli, joshimath and pokhari under edd gopeshwar through outer agency against oandm head
Read moreof your Industry type