Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Embankment From Bogapani To Borjuli On Left Bank Of River Gabharu, Package 2.
|
| Description |
Construction Of Embankment From Bogapani To Borjuli On Left Bank Of River Gabharu, Package 2.
|
| Organisation | Department of Water Resources | State Govt. and UT |
| Tender Id | 2025_DoWR_47501_1 |
|
Reference Number |
SONITPUR/2025-26/RIDF/I |
| Tender Fee | 9000 |
| EMD | 8.7 Lakh |
| Tender Value | - |
| Place | Sonitpur |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=75807 |
| Start Date | September 23, 2025 15:30 |
| End Date |
Expired
07/10/2025
Expired 336 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Survey, investigation, design, supply, erection, testing and commissioning of lis for supplementing water to suffering atchkat of 3997ha of d 76 of tlbc by lifting water from tungabhadra river near yedival village of manvi taluk, raichur district on turnkey basis, phase i
Work comprising of construction of intake structure, jack well cum pumphouse, pumping machineries (2 pumps), 33/6.6kv electrical substation with power transformer, 33kv transmission line, 110/33kv transformer bay with 33kv terminal bay, rising main including supply of spare parts and tools, o and m for five years after successful commissioning of the entire scheme on turnkey basis
Read moreConstruction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreSupply of vehicle (including driver) bolero/car (ac) on monthly rental basis for 2500km per month or 300 hours per month. for (assistant director of agriculture sub-division no-2 salotigi) from september 2026 to march 2027 for the year 2026-27
Supply of vehicle (including driver) bolero/car (ac) on monthly rental basis for 2500km per month or 300 hours per month. for (assistant director of agriculture sub-division no-2 salotigi) from september 2026 to march 2027 for the year 2026-27
Read moreConstruction of embankment on left bank of river kakodunga from chabuk dhora gaon to mohbandha pwd road, package 1.
Construction of embankment on left bank of river kakodunga from chabuk dhora gaon to mohbandha pwd road, package 1.
Read moreConstruction of embankment on the left bank of river kopilli at garukhunda, borchung to changchaki and on the right bank from bareguga to niz-narikali. package 2
Construction of embankment on the left bank of river kopilli at garukhunda, borchung to changchaki and on the right bank from bareguga to niz-narikali.
Read moreStrengthening of both bank embankment of river gabharu at different inadequate sections and anti-erosion measures at kalakuchi and ghatua on r/b and l/b from the erosion of river gabharu.
Strengthening of both bank embankment of river gabharu at different inadequate sections and anti-erosion measures at kalakuchi and ghatua on r/b and l/b from the erosion of river gabharu.
Read moreConstruction of new embankment from niznarikoli to bahakabari on the right bank of river kopilli, package 2.
Construction of new embankment from niznarikoli to bahakabari on the right bank of river kopilli, package 2.
Read moreStrengthening of both bank embankment of river gabharu at different inadequate sections and anti-erosion measures at kalakuchi and ghatua on r/b and l/b from the erosion of river gabharu. retender
Strengthening of both bank embankment of river gabharu at different inadequate sections and anti-erosion measures at kalakuchi and ghatua on r/b and l/b from the erosion of river gabharu.
Read moreConstruction of new embankment along left bank river shingla from kurikhala to bhavanipur.
Construction of new embankment along left bank river shingla from kurikhala to bhavanipur.
Read moreof your Industry type