Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Execution Of Bituminous Overlay Works Under Periodic Maintenance At Identified Locations From Km. 260.000 (New Km. 262.200) To Km. 338.923 (New Km. 341.123) Of Davanagere Haveri Section On Nh 48 (Old Nh 4) In The State Of Karnataka
|
| Description |
Execution Of Bituminous Overlay Works Under Periodic Maintenance At Identified Locations From Km. 260.000 (New Km. 262.200) To Km. 338.923 (New Km. 341.123) Of Davanagere Haveri Section On Nh 48 (Old Nh 4) In The State Of Karnataka
|
| Organisation | IRCON International Limited | Public Sector Undertakings |
| Tender Id | 2026_IRCON_277395_1 |
|
Reference Number |
IRCON/DHHP/e Tender/Bituminous Overlay /17 |
| Tender Fee | 30000 |
| EMD | 12.01 Lakh |
| Tender Value | - |
| Place | Ranebennur, Karnataka |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323961 |
| Start Date | May 19, 2026 14:30 |
| End Date |
Expired
25/05/2026
Expired 146 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening and overlay on damaged sections of six lane ahmedabad to vadodara section of nh 48 (old nh-8) from km. 6.400 to km. 108.700 (length 102.300 km) in the state of gujarat at risk and cost of concessionaire on single percentage item rate ba
Strengthening and overlay on damaged sections of six lane ahmedabad to vadodara section of nh 48 (old nh-8) from km. 6.400 to km. 108.700 (length 102.300 km) in the state of gujarat at risk and cost of concessionaire on single percentage item rate ba
Read more4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
Read moreCs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode
Cs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode
Read moreConstruction of new toll plaza (12 lane) including administrative building and other works at kunimellihalli km.347.180 of chitradurga davanagere haveri hubli section of nh-48 in the state of karnataka on epc mode (for nhit eastern projects pvt. ltd)
Construction of new toll plaza (12 lane) including administrative building and other works at kunimellihalli km.347.180 of chitradurga davanagere haveri hubli section of nh-48 in the state of karnataka on epc mode (for nhit eastern projects pvt. ltd)
Read moreAnnual maintenance of sh-235 chikkabennuru (sh-48) to kurubarahalli joining road via halerangapura alagavadi pudakalahalli bhavihal chinnasamudra hebbalu (nh-48) hunasekatte (nh-48) gummanuru kandanakovi agasanakatte igori kenchavvanahalli basapura anekonda davanagere yaragunte avaragolla kakkeharavu kondajji ch 0.00 to 16.31 km in chitradurga taluk
Annual maintenance of sh-235 chikkabennuru (sh-48) to kurubarahalli joining road via halerangapura alagavadi pudakalahalli bhavihal chinnasamudra hebbalu (nh-48) hunasekatte (nh-48) gummanuru kandanakovi agasanakatte igori kenchavvanahalli basapura anekonda davanagere yaragunte avaragolla kakkeharavu kondajji ch 0.00 to 16.31 km in chitradurga taluk
Read moreRectification of 05 nos. morth identified blackspots on gulabpura chittorgarh section of nh 48 and rajsamand bhilwara and bhilwara ladpura section of nh 758 along with rectification of 01 nos. accident spots on gulabpura chittorgarh section of nh 48
Rectification of 05 nos. morth identified blackspots on gulabpura chittorgarh section of nh 48 and rajsamand bhilwara and bhilwara ladpura section of nh 758 along with rectification of 01 nos. accident spots on gulabpura chittorgarh section of nh 48
Read morePeriodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand
Periodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand
Read moreSurface renewal of the existing bituminous pavement with 30mm and 40mm thick bituminous concrete overlay at stretches from km.345tokm.357(l 13.0km.) (kanchanjuri to bagori) of nh-37 (new nh-715) including construction of rcc drain cum footpath at km.
Surface renewal of the existing bituminous pavement with 30mm and 40mm thick bituminous concrete overlay at stretches from km.345tokm.357(l 13.0km.) (kanchanjuri to bagori) of nh-37 (new nh-715) including construction of rcc drain cum footpath at km.
Read moreOverlay, routine maintenance and incident management works on four lane rohtak-bawal section of nh-352 (old nh-71) from km. 363.300 (intersection with nh-09) to km. 446.955 (intersection with nh-48) in the state of haryana
Overlay, routine maintenance and incident management works on four lane rohtak-bawal section of nh-352 (old nh-71) from km. 363.300 (intersection with nh-09) to km. 446.955 (intersection with nh-48) in the state of haryana
Read moreSurface renewal of the existing bituminous pavement with 30mm and 40mm thick bituminous concrete overlay at stretches from km.345 to km.357 (l 13.0km.) (kanchanjuri to bagori) of nh-37 (new nh-715) including construction of rcc drain cum footpath at
Surface renewal of the existing bituminous pavement with 30mm and 40mm thick bituminous concrete overlay at stretches from km.345 to km.357 (l 13.0km.) (kanchanjuri to bagori) of nh-37 (new nh-715) including construction of rcc drain cum footpath at
Read moreof your Industry type