Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Hiring Of 1 Pair Of Ofc
|
| Description |
|
| Organisation | Department of Telecommunications (DOT) | Ministry of Communications |
| Tender Id | GEM/2024/B/5106549 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 24, 2024 17:20 |
| End Date |
Expired
14/08/2024
Expired 794 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Ofc 6 core armoured,jfc 50 pair armoured,jfc 20 pair armoured,jfc 10 pair armoured,jfc 05 pair armoured,hdpe pipe 32mm,concrete route marker,electronic route marker,utp cable cat 6,4 u rack,ofc jointing kit,tiffin box type ofc joint enclosure,fxo fxs 4 port 20 km,laying and digging ofc and jfc cable
Ofc 6 core armoured,jfc 50 pair armoured,jfc 20 pair armoured,jfc 10 pair armoured,jfc 05 pair armoured,hdpe pipe 32mm,concrete route marker,electronic route marker,utp cable cat 6,4 u rack,ofc jointing kit,tiffin box type ofc joint enclosure,fxo fxs 4 port 20 km,laying and digging ofc and jfc cable
Read more2 pair t type thermocouple cable,1 pair 18 awg fieldbus h1 spur cable
2 pair t type thermocouple cable,1 pair 18 awg fieldbus h1 spur cable
Read more48f ofc,48 fdms box,iron loop holder clamp,laying and installation of 48f ofc,48f armoured ofc,48f ofc joint closure,execution of laying of hdpe duct,ofc 48f pulling,hdpe single duct,rcc chamber,rcc route marker,48f splicing joint closure,6f ofc,new gi iron pole,6f ofc overhead laying,new gi iron pole installation,6f ofc,ofc small terminal box,6f ofc overhead laying 1000 mts,6f ofc splicing
48f ofc,48 fdms box,iron loop holder clamp,laying and installation of 48f ofc,48f armoured ofc,48f ofc joint closure,execution of laying of hdpe duct,ofc 48f pulling,hdpe single duct,rcc chamber,rcc route marker,48f splicing joint closure,6f ofc,new gi iron pole,6f ofc overhead laying,new gi iron pole installation,6f ofc,ofc small terminal box,6f ofc overhead laying 1000 mts,6f ofc splicing
Read more2 pair 1point5 mm2 annealed tinned solid copper conductor,3 pair 1point5 mm2 annealed tinned solid copper conductor,5 pair 1point5 mm2 annealed tinned solid copper conductor,10 pair 1point5 mm2 annealed tinned solid copper conductor,25 pair 1point5 mm2 annealed tinned solid copper conductor,50 pair 1point5 mm2 annealed tinned solid copper conductor
2 pair 1point5 mm2 annealed tinned solid copper conductor,3 pair 1point5 mm2 annealed tinned solid copper conductor,5 pair 1point5 mm2 annealed tinned solid copper conductor,10 pair 1point5 mm2 annealed tinned solid copper conductor,25 pair 1point5 mm2 annealed tinned solid copper conductor,50 pair 1point5 mm2 annealed tinned solid copper conductor
Read moreCable, unarm, screen pair, (6x2) x1.5 sq. mm,cable, unarm, screen pair, (3x2) x1.5 sq. mm
Cable, unarm, screen pair, (6x2) x1.5 sq. mm,cable, unarm, screen pair, (3x2) x1.5 sq. mm
Read more1 pair 22 awg instrumentation ptfe cable,3 pair 22 awg instrumentation ptfe cable,12 pair 22 awg instrumentation ptfe cable,24 pair 22 awg instrumentation ptfe cable,1 core bi colour 22 awg instrumentation ptfe cable
1 pair 22 awg instrumentation ptfe cable,3 pair 22 awg instrumentation ptfe cable,12 pair 22 awg instrumentation ptfe cable,24 pair 22 awg instrumentation ptfe cable,1 core bi colour 22 awg instrumentation ptfe cable
Read moreof your Industry type