Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Turbine Rotor Internal Refurbishment202425
|
| Description |
|
| Organisation | NTPC SAIL Power Company Ltd | Ministry of Power |
| Tender Id | GEM/2024/B/5606574 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | December 10, 2024 18:56 |
| End Date |
Expired
20/12/2024
Expired 663 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Assembly of gas turbine rotor with the supply of consumables make
Assembly of gas turbine rotor with the supply of consumables makesiemens model v94.2 at ntpc dadri
Read moreReconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine of
Reconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine ofntpc anta
Read moreProcurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Procurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Read moreSupply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Supply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Read moreProcurement of braun make spares for turbine bfp and hydro turbine
Procurement of braun make spares for turbine bfp and hydro turbine speed measuring instruments for stage 2 3 4 5
Read moreReplacement of 350kw motors rotor outer bars.
Replacement of 6.6kv, 350kw squirrel cage induction motors outer rotor bars with new bars.
Read moreWork of re-insulation of generator rotor coils, damper segment of generator rotor unit no. 4, packing, transportation from sgtps ph-ii to firm workshop n vice versa, work of generator rotor repairing for the rectification of rotor earth of 210, sgtps
Work of re-insulation of generator rotor coils, damper segment of generator rotor unit no. 4, packing, transportation from sgtps ph-ii to firm workshop n vice versa, work of generator rotor repairing for the rectification of rotor earth of 210, sgtps
Read moreS.56 nctps ii es circle em i division turbine motors complete stator rewinding and rotor rebarring of two numbers of failed 12mw 11 kv mdbfp ht motor ms bhel 28 tonnes each
S.56 nctps ii es circle em i division turbine motors complete stator rewinding and rotor rebarring of two numbers of failed 12mw 11 kv mdbfp ht motor ms bhel 28 tonnes each
Read moreof your Industry type