Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of 20 Kld Co Treatment Plant, Retaining Wall, Supply Of De Sludging Vehicles And Related Works
|
Description |
Surveying,&Amp#X0d
Design And Supply Of All Materials, Labour, Tp Etc. Complete Required For Completion&Amp#X0d
Of Following Works Of &Amp#X0d
Construction Of 20 Kld Cotreatment Plant And Its Appurtenant Works
|
Organisation | U P Jal Nigam (HQ), Lucknow | State Govt. and UT |
Tender Id | 2025_UPJNM_995032_1 |
Reference Number |
88/W-30/01 |
Tender Fee | 11800 |
EMD | 3.6 Lakh |
Tender Value | |
Place | Balrampur |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1762533 |
Start Date | January 19, 2025 16:30 |
End Date |
21/02/2025 ( Expired 125 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Read moreDesign, construction, supply, installation and commissioning of package type sewerage treatment plant (based on mbr technology) within power plant area of chandrapura thermal power station on epc basis
Design, construction, supply, installation and commissioning of package type sewerage treatment plant (based on mbr technology) within power plant area of chandrapura thermal power station on epc basis
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreRejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur
Rejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur
Read moreSupply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreManufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss
Manufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss
Read moreSupply of desalter package
Design, engineering, manufacturing, procurement of materials and bought out components, assembly at shop, inspection including inspection by tpia, testing at manufacturers works, packing, supply of desalter package
Read moreRepair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structures) with 5 year maintenance under nabard loan/mc/mb fund distt jalandhar
Repair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structure) with 5 year maintenance under nabard loan/mc/mb funds distt jalandhar
Read moreof your Industry type