Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm Ii Acp Rubber Lining In The Existing Air Duct At O Mtr Near Sea Water Booster Pump, New Air Duct Fabrication, Erection And Painting The Incoming Duct Of O Mtr Cable Gallery At Unit V Air Washer Duct
|
Description |
Ttps Operation Circle Mpm Ii Acp Rubber Lining In The Existing Air Duct At O Mtr Near Sea Water Booster Pump, New Air Duct Fabrication, Erection And Painting The Incoming Duct Of O Mtr Cable Gallery At Unit V Air Washer Duct
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_453948_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.134/24-25 |
Tender Fee | 0 |
EMD | 2000 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=540166 |
Start Date | June 13, 2024 18:30 |
End Date |
28/06/2024 ( Expired 321 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Read moreTtps operation circle mpm ii acp servicing of air conditioning system air ducts in unit control room, ventilation air duct of unit iii fan house to 6.6 kv switch gear room etc
Ttps operation circle mpm ii acp servicing of air conditioning system air ducts in unit control room, ventilation air duct of unit iii fan house to 6.6 kv switch gear room etc
Read moreTtps operation circle mpm ii acp attending emergency works in condenser, chiller pumps, cw pumps, cw pipe lines, cleaning of ac plant equipments, assisting shift operators in changeover of running equipments etc., in ac plant air washer system etc
Ttps operation circle mpm ii acp attending emergency works in condenser, chiller pumps, cw pumps, cw pipe lines, cleaning of ac plant equipments, assisting shift operators in changeover of running equipments etc., in ac plant air washer system etc
Read moreTtps operation circle cad cwph i breakdown maintenance rubber lining of various sizes of ms pipes fitting of sea water system of unit i to v for the period from 01.04.2025 to 31.03.2026
Ttps operation circle cad cwph i breakdown maintenance rubber lining of various sizes of ms pipes fitting of sea water system of unit i to v for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm ii acp stage i, ii iii attending break down works in ac plant unit i to v, switch yard compressors etc. for a period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm ii acp stage i, ii iii attending break down works in ac plant unit i to v, switch yard compressors etc. for a period from 01.04.2025 to 31.03.2026
Read moreErection of cable tray arrangements between n e switchgear fabrication and erection of cable tray supporting structure at cable gallery 0 mtr in unit iv v and re laying of power and control cables of 2 series aph md sb gb modules from n e v to bmcc
Erection of cable tray arrangements between n e switchgear fabrication and erection of cable tray supporting structure at cable gallery 0 mtr in unit iv v and re laying of power and control cables of 2 series aph md sb gb modules from n e v to bmcc
Read moreTtps operation circle mpm ii acp replacement of cooling tower a, b c structural supports, pipe line stand supports and motor lifting arrangement at unit-iv v ac plant
Ttps operation circle mpm ii acp replacement of cooling tower a, b c structural supports, pipe line stand supports and motor lifting arrangement at unit-iv v ac plant
Read moreTtps operation circle mpm ii unit-iv attending the coal chocking in unit-iv v hp 803 mill from mill discharge to boiler corner by using air during chocking of any mill after cutting the coal pipe at various length and lowering etc.,
Ttps operation circle mpm ii unit-iv attending the coal chocking in unit-iv v hp 803 mill from mill discharge to boiler corner by using air during chocking of any mill after cutting the coal pipe at various length and lowering etc.,
Read moreNctps ii mi circle mpm unit i ab row ventilation air washer system fabrication and erection of deteriorated
Nctps ii mi circle mpm unit i ab row ventilation air washer system fabrication and erection of deteriorated
Read moreTtps operation circle cad dismantling, renewal and assembling of 450nb suction bend from released second hand 450nb ss pipe fitting for sea water booster pump a, b, c and d in unit iv acw system
Ttps operation circle cad dismantling, renewal and assembling of 450nb suction bend from released second hand 450nb ss pipe fitting for sea water booster pump a, b, c and d in unit iv acw system
Read moreof your Industry type