Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Mpm Ii Ac Plant Unit I Fan House Cleaning Of Entire Ventilation Air Ducts And Air Grills Including Renewing Of Damaged Ducts
|
Description |
Ttps Mpm Ii Ac Plant Unit I Fan House Cleaning Of Entire Ventilation Air Ducts And Air Grills Including Renewing Of Damaged Ducts
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_EB_358375_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.147/23-24 |
Tender Fee | 0 |
EMD | 5900 |
Tender Value | |
Place | O/o SE/O/TTPS |
Link | https://tntenders.gov.in |
Start Date | August 11, 2023 23:30 |
End Date |
17/08/2023 ( Expired 690 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provision of deficient fire main system to store house ac-i ac-ii ac-iii r d sh mech sh p-38 building and pol store at weapon equipment depot under ge u-ii, visakhapatnam
Provision of deficient fire main system to store house ac-i ac-ii ac-iii r d sh mech sh p-38 building and pol store at weapon equipment depot under ge u-ii, visakhapatnam
Read moreProcurement of square tiles, round tiles and air washer assembly for ahp of unit no. 1 to 4, ph-i and ii, at sgtps, mppgcl, birsinghpur.
Procurement of square tiles, round tiles and air washer assembly for ahp of unit no. 1 to 4, ph-i and ii, at sgtps, mppgcl, birsinghpur.
Read moreTtps mech ii tm i unit iii renewel of piston seals piston rod packings in hp lp bypass valves and its spray valves actuators including servicing of oil filters during annual overhaul 2025 26
Ttps mech ii tm i unit iii renewel of piston seals piston rod packings in hp lp bypass valves and its spray valves actuators including servicing of oil filters during annual overhaul 2025 26
Read moreTtps mech ii tm i unit iii overhauling of turbine lub oil system seal oil system valves and equipments during annual overhaul 2025 26
Ttps mech ii tm i unit iii overhauling of turbine lub oil system seal oil system valves and equipments during annual overhaul 2025 26
Read moreTtps mech ii tm i unit iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves during annual overhaul 2025 26
Ttps mech ii tm i unit iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves during annual overhaul 2025 26
Read moreTtps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2025 26
Ttps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2025 26
Read moreTtps mech ii tm i unit iii overhauling of hp lp by pass valves and crh nrvs during annual overhaul 2025 26
Ttps mech ii tm i unit iii overhauling of hp lp by pass valves and crh nrvs during annual overhaul 2025 26
Read moreTtps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Read moreTtps mech ii tm i unit iii inspection of governing elements checking h gap mop float renewal of mop bearings if necessary overhauling of cvsm pilot feed back pilot and intermediate pilot valves mop nrv etc during annual overhaul 2025 26
Ttps mech ii tm i unit iii inspection of governing elements checking h gap mop float renewal of mop bearings if necessary overhauling of cvsm pilot feed back pilot and intermediate pilot valves mop nrv etc during annual overhaul 2025 26
Read moreTtps mech ii tm i unit iii overhauling of steam and condensate valves flange gasket renewal and machining of valves yoke bush in main turbine system during annual overhaul 2025 26
Ttps mech ii tm i unit iii overhauling of steam and condensate valves flange gasket renewal and machining of valves yoke bush in main turbine system during annual overhaul 2025 26
Read moreof your Industry type