Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Cleaning Of Coal Transporting Road (By Manual Labour) From Nh 2 To Central Pool Railway Siding Under Lakhimata Group Of Mines
|
Description |
Cleaning Of Coal Transporting Road (By Manual Labour) From Nh 2 To Central Pool Railway Siding Under Lakhimata Group Of Mines
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_310363_1 |
Reference Number |
ECL/GM/MA/CE/24-25/eTender/117 Dt. 12.06.2024 |
Tender Fee | 0 |
EMD | 14500 |
Tender Value | |
Place | Central Pool Railway Siding |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321592 |
Start Date | June 18, 2024 19:30 |
End Date |
28/06/2024 ( Expired 376 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreRepairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreBalance work of rectification of blackspot by construction of approach road with re wall at sathoor junction flyover from ch. 201.050 to 202.005 (bhs) on deoli kota section from km 167.624 to km 250.144 of nh 52 in the state of rajasthan on epc mode
Balance work of rectification of blackspot by construction of approach road with re wall at sathoor junction flyover from ch. 201.050 to 202.005 (bhs) on deoli kota section from km 167.624 to km 250.144 of nh 52 in the state of rajasthan on epc mode
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreUpgradation of bsnl office to railway crossing in bhandara city from chainage km 168/180 to km 168/920 (length 0.740 km) of nh-247 to two lane with paved shoulder configuration of bhandara-khat-ghotitok road in the state of maharashtra on epc mode
Upgradation of bsnl office to railway crossing in bhandara city from chainage km 168/180 to km 168/920 (length 0.740 km) of nh-247 to two lane with paved shoulder configuration of bhandara-khat-ghotitok road in the state of maharashtra on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreCleaning and repairs to area drainage, sewage system including cleaning of septic tanks by mechanical means in zone b and e area under ge chennai
Cleaning and repairs to area drainage, sewage system including cleaning of septic tanks by mechanical means in zone b and e area under ge chennai
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreof your Industry type