Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
π³π§ Bid Invitation: Comprehensive Development Project At Bktpp Township π³π§ The West Bengal Power Development Corporation Ltd., A State Government Entity, Is Seeking Bids For A Comprehensive Development Project At Bktpp Township. ποΈ πΉ Services Required: Comprehensive Cleaning With Tree Trimming, Area Grading, And Construction Of A Peripheral Security Road Along The Inside Peripheral Boundary Wall. π Bid Submission Deadline: July 18, 2024, 4:00 Pm π² Earnest Money Deposit (Emd): Inr 24,876 Interested Bidders Must Submit Detailed Proposals, Including Method Statements, Timelines, And Cost Estimates, For The Execution Of This Project. The Project Will Enhance The Security And Aesthetics Of The Bktpp Township Area. Keywords: Comprehensive Cleaning, Tree Trimming, Area Grading, Security Road Construction, Bktpp Township, West Bengal Power Development Corporation Limited, State Government Project, Ut, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Comprehensive Cleaning With Tree Trimming, With Necessary Area Grading Including Construction Of Peripheral Security Road Along The Inside Peripheral Boundary Wall Of Bk Tpp Township
|
Description |
Comprehensive Cleaning With Tree Trimming, With Necessary Area Grading Including Construction Of Peripheral Security Road Along The Inside Peripheral Boundary Wall Of Bk Tpp Township
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id | 2024_WBPDC_696484_1 |
Reference Number |
WBPDCL/BKTPP/NIT/E3157/24-25 |
Tender Fee | 0 |
EMD | 24876 |
Tender Value | |
Place | BKTPP |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1517036 |
Start Date | July 04, 2024 14:30 |
End Date |
18/07/2024 ( Expired 339 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of frisking room, vehicular lane shed at operational area entry gates and boundary wall along cisf barrack at b.m. airport, ranchi.
Construction of frisking room, vehicular lane shed at operational area entry gates and boundary wall along cisf barrack at b.m. airport, ranchi.
Read moreRepair and renovation of main building along with construction of boundary wall surrounding the animal hospital (sahc building), gourdaha under canning-1 block, south 24 parganas.
Repair and renovation of main building along with construction of boundary wall surrounding the animal hospital (sahc building), gourdaha under canning-1 block, south 24 parganas.
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of bio-security facility and entrance road and other allied work along with construction of fodder storage and thrashing floor inside the fodder section of bull mother farm, kalyani, nadia-741235 under paschim banga go-sampad bikash san
Construction of bio-security facility and entrance road and other allied work along with construction of fodder storage and thrashing floor inside the fodder section of bull mother farm, kalyani, nadia-741235 under paschim banga go-sampad bikash san
Read moreConstruction of 100 seated working women hostel along with construction of hall for indoor game gym, construction of boundary wall l. 270.00 mtr. around the building construction of park for children outside the building at ad nagar under rd agart
Construction of 100 seated working women hostel along with construction of hall for indoor game gym, construction of boundary wall l. 270.00 mtr. around the building construction of park for children outside the building at ad nagar under rd agart
Read moreConstruction of 100 seated working women hostel along with construction of hall for indoor game gym, construction of boundary wall l 270.00 mtr.around the building construction of park for children outside the building at ujan abhoynagar und
Construction of 100 seated working women hostel along with construction of hall for indoor game gym, construction of boundary wall l 270.00 mtr.around the building construction of park for children outside the building at ujan abhoynagar und
Read moreConstruction of internal road connectivity near charak and cobalt area along with dump station at abv regional cancer centre, agartala, tripura (w) during the year 2025-26
Construction of internal road connectivity near charak and cobalt area along with dump station at abv regional cancer centre, agartala, tripura (w) during the year 2025-26
Read moreMaintenance of water supply line including periodical cleaning of water tank, valve chambers, water main-line wash along with other miscellaneous work for a period of two years (2024-2026) in haldia township area under rz and spl. rt section, h.d.c
Maintenance of water supply line including periodical cleaning of water tank, valve chambers, water main-line wash along with other miscellaneous work for a period of two years (2024-2026) in haldia township area under rz and spl. rt section, h.d.c
Read moreConstruction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreof your Industry type