Tender Details

Particulars Details
Title
Demarcation And Protection Of Acquired Land By Providing Barbed Wired Fencing Between Ch.28550m To Ch.29300m At Bharebhat, Arlem Under Maintenance Of Salaulim Water Supply Scheme. L3
Description
Demarcation And Protection Of Acquired Land By Providing Barbed Wired Fencing Between Ch.28550m To Ch.29300m At Bharebhat, Arlem Under Maintenance Of Salaulim Water Supply Scheme. L3
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id 2024_PWD_17385_1
Reference
Number
48-1/PWD-WD XII-ASW/2024-25/04 L3
Tender Fee 5390
EMD 23903
Tender Value
Place Executive Engineer PWD WD XII Sanguem-Goa
Link https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=17710
Start Date September 20, 2024 23:30
End Date

27/09/2024 ( Expired 267 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Special repair to roof and rain water protection in certain bldgs at mil stn mount abu under age (i) udaipur

Special repair to roof and rain water protection in certain bldgs at mil stn mount abu under age (i) udaipur

Read more
Renovation of gravelling work by providing concrete base including other miscellaneous work at 132/ 33 kv switch yards of (i) north karanpura sub-station and (ii) patratu sub-station under gomd-vii, dvc, ramgarh

Renovation of gravelling work by providing concrete base including other miscellaneous work at 132/ 33 kv switch yards of (i) north karanpura sub-station and (ii) patratu sub-station under gomd-vii, dvc, ramgarh

Read more
Repair and maintenance of water supply pipe line and sanitation work for colony quarters and offices at dvc, tilaiya dam, t. k. division konar

Repair and maintenance of water supply pipe line and sanitation work for colony quarters and offices at dvc, tilaiya dam, t. k. division konar

Read more
Special repair to replacement and re-routing of ht cable 11000 volts from 33/11 kv grid at kirby place to mrs chitral line under ge (u) elect supply delhi cantt-10

Special repair to replacement and re-routing of ht cable 11000 volts from 33/11 kv grid at kirby place to mrs chitral line under ge (u) elect supply delhi cantt-10

Read more
Repair and maintenance to 11 kv switchgear power transformer ht yard maint with connected items at 33/11 kv shekhawati grid under ge (u) elect supply delhi cantt-10

Repair and maintenance to 11 kv switchgear power transformer ht yard maint with connected items at 33/11 kv shekhawati grid under ge (u) elect supply delhi cantt-10

Read more
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Read more
Comprehensive running operation and maintenance of 245 mld wtp, primary treatment works, raw clear water conveyance mains, horticulture works, supply of consumables and other appurtenant works under 100 cusec water supply scheme, siddharth vihar,

Comprehensive running / operation and maintenance&amp#x0d of 245 mld wtp, ptw, raw &amp#x0d clear water conveyance mains, horticulture works,&amp#x0d supply of consumables and other appurtenant works&amp#x0d under 100 cusec water supply scheme,&amp#x0d siddharth vihar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise