Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renovation Work Of Left Gajadharganj (Kaudiawan) Link Road From Kilometer 0 1 Of Kurebhar Railway Feeder.
|
| Description |
Boq
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_CEUFZ_817653_1 |
|
Reference Number |
2215/2A/2022-23 DATE-21.06.2023 |
| Tender Fee | 944 |
| EMD | 2.7 Lakh |
| Tender Value | - |
| Place | EX, ENG. PD PWD SULTANPUR |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | July 04, 2023 17:30 |
| End Date |
Expired
14/07/2023
Expired 1190 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of a 3-cell rcc box culvert (with 3x3m spans) over the local drain at the 1st kilometer of the bhadaiya railway feeder connecting road in sultanpur district
Construction of a 3-cell rcc box culvert (with 3x3m spans) over the local drain at the 1st kilometer of the bhadaiya railway feeder connecting road in sultanpur district
Read moreSpecial repair to 1 kilometer chain link fence at patiala under ge (south) patiala
As per tender documents
Read morePermanent restoration link road mehndi 0/0 to 1/0
Permanent restoration link road mehndi 0/0 to 1/0
Read moreLeft out portion of nh-27 at polaikalan ch. 0/2500
Left out portion of nh-27 at polaikalan ch. 0/2500
Read moreC/o link road from sarain to jasot kuftu,teel km. 0/0 to 0/940
Formation cutting 5/7 mtr. wide at r.d. 0/0 to 0/940
Read moreAnnual surfacing on (i) link road from hiranagar petrol pump to jablog km. 0/00 to 0/750 (portion km. 0/00 to 0/750) (ii) link road from banuti to mansa mata temple in km. 0/00 to 0/600(iii) link road to village panti in km. 0/00 to 0/645
Providing and laying 25 mm thick bituminous concrete along with p/l of hot applied thermo plastic compound 2.50 mm thick for edge line under amp 2026-27 addl. km.
Read moreC/o link road to village dakhroon km 0/00 to 0/700.
P/l gsb, wmm tarring from 0/00 to 0/400, p/l cc pavement at rd 0/400 to 0/500 c/o r/wall at various rds).
Read moreEstimate for rehabilitation of feeder no.1 from rd 0 to 14000
Estimate for rehabilitation of feeder no.1 from rd 0 to 14000
Read moreof your Industry type