Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Balance Work Of Bypass Around Gumla Town Connecting Nh 78 And Nh 23(r G) In The State Of Jharkhand (Km 0.00 To Km 12.842) On Epc Mode. (Job No. 078 And 023 Jhr 2013 14 229)
|
Description |
Construction Of Balance Work Of Bypass Around Gumla Town Connecting Nh 78 And Nh 23(r G) In The State Of Jharkhand (Km 0.00 To Km 12.842) On Epc Mode. (Job No. 078 And 023 Jhr 2013 14 229)
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_MoRTH_772137_1 |
Reference Number |
NH/Gumla/EPC/01/2023-24 |
Tender Fee | 10000 |
EMD | 15.35 Lakh |
Tender Value | |
Place | CE NH WING, JHARKHAND, RANCHI |
Link | https://eprocure.gov.in |
Start Date | September 21, 2023 15:40 |
End Date |
03/11/2023 ( Expired 570 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreConstruction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar
Construction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreConstruction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode
Construction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for patrachauli fp at km 20.232 from km 3.450 to km 26.00 on ranchi piska more to palma section of nh-23 under epc mode in jharkhand
Engagement of user fee collection agency on the basis of cb through e-tender for patrachauli fp at km 20.232 from km 3.450 to km 26.00 on ranchi piska more to palma section of nh-23 under epc mode in jharkhand
Read moreEngagement of user fee collection agency on the basis of e-quotation through e-tender for patrachauli fee plaza at km 20.232 on ranchi piska more to palma section of nh-23 under epc mode in the state of jharkhand
Engagement of user fee collection agency on the basis of e-quotation through e-tender for patrachauli fee plaza at km 20.232 on ranchi piska more to palma section of nh-23 under epc mode in the state of jharkhand
Read moreRfp for balance work of nh 66 from design km 84.000 to km 87.100 (indapur bypass) and km 91.600 to km 99.100 (mangaon bypass) to four-lane with paved shoulder in the state of maharashtra under nh(o) on epc mode (length10.60 km)
Rfp for balance work of nh 66 from design km 84.000 to km 87.100 (indapur bypass) and km 91.600 to km 99.100 (mangaon bypass) to four-lane with paved shoulder in the state of maharashtra under nh(o) on epc mode (length10.60 km)
Read moreBalance work of construction of two lane with paved shoulder configuration of kawai bypass of nh-752 from km 41 . 560 to 50 . 650 (design ch 0 . 000 to 8 . 700) on epc mode under annual plan 2024-25 in the state of rajasthan.
Balance work of construction of two lane with paved shoulder configuration of kawai bypass of nh-752 from km 41 . 560 to 50 . 650 (design ch 0 . 000 to 8 . 700) on epc mode under annual plan 2024-25 in the state of rajasthan.
Read moreEngagement of user fee agency through e-tender at patrachauli fee plaza at km 20.232 from km 3.450 to km 26.00 on ranchi piska more to palma section of nh-23 under epc mode in the state of jharkhand
Engagement of user fee agency through e-tender at patrachauli fee plaza at km 20.232 from km 3.450 to km 26.00 on ranchi piska more to palma section of nh-23 under epc mode in the state of jharkhand
Read moreWork of widening to two lanes with paved shoulder (except in flyover part of 500m) from km 122.15 to km 138.20 of nh 114a within available row in the state of jharkhand under epc mode (working length of the project as per tcs 14 km).
Work of widening to two lanes with paved shoulder (except in flyover part of 500m) from km 122.15 to km 138.20 of nh-114a within available row in the state of jharkhand under epc mode (working length of the project as per tcs 14 km).
Read moreof your Industry type