Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of General Civil Works Like Dismantling Rcc Foundation, Brick, Pcc Etc, Excavation, Pcc, Reinforcement, Shuttering, Rcc, Backfilling, Finishing Works, Etc. For Installation Of 2 X100 Mt Above Ground Bullet At Silchar Bp, Assam
|
| Description |
Construction Of General Civil Works Like Dismantling Rcc Foundation, Brick, Pcc Etc, Excavation, Pcc, Reinforcement, Shuttering, Rcc, Backfilling, Finishing Works, Etc. For Installation Of 2 X100 Mt Above Ground Bullet At Silchar Bp, Assam
|
| Organisation | IndianOil | Central Govt. Ministry/Department |
| Tender Id | 2025_ERO_186516_1 |
|
Reference Number |
MAC/ERO/37/2025-26/PT-35 |
| Tender Fee | 0 |
| EMD | 34900 |
| Tender Value | - |
| Place | Silchar BP, Assam |
| Link |
View Original Tender Notice
https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=196797 |
| Start Date | September 09, 2025 16:30 |
| End Date |
Expired
15/09/2025
Expired 394 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreDismantling brick work,dismantling pcc or rcc,excavation of earth,pcc m10,rcc m20,shuttering,steel
Read more
Dismantling brick work,dismantling pcc or rcc,excavation of earth,pcc m10,rcc m20,shuttering,steel
Read more
Dismantling brick work,dismantling pcc or rcc,excavation of earth,pcc m10,rcc m20,shuttering,steel
Read more
Dismantling brick work,dismantling pcc or rcc,excavation of earth,pcc m10,rcc m20,shuttering,steel
Read more
Stp of capacity 60 kld,excavation of earth,backfilling of excavation pit,pcc,rcc,bar screen chamber
Read more
of your Industry type