Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Stg And Aux, Boiler And Aux, Power Cycle Piping, Esp And Aux, Cw Piping, Lp Piping (Including Common System Lp Piping), Raw Water/Yard Piping, Dg Sets And Fdps, Including Common Areas Of 2x800 Mw Dvc Koderma Tpp Stage Ii
|
| Description |
Erection, Testing, Commissioning, Trial Operation And Handing Over Including Handling Of Materials At Bhel / Clients Stores / Storage Yard And Transportation To Site, Preparation Of Foundation, Ndt, Fixing Of Hangers Supports, Application Of Lining
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2025_BHEL_52407_1 |
|
Reference Number |
BHEL/CPC/KOD/BTG-ESP/26/033 |
| Tender Fee | 0 |
| EMD | 50 Lakh |
| Tender Value | - |
| Place | Koderma |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=56476 |
| Start Date | September 03, 2025 15:30 |
| End Date |
Expired
30/09/2025
Expired 325 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Etc trial operation and handing over of boiler and auxiliaries scr auxiliaries esp and auxiliaries pumps/fans ducts mills and auxiliaries power cycle piping lp piping at 1x150 mw lapanga odhisa
Etc trial operation and handing over of boiler and auxiliaries scr auxiliaries esp and auxiliaries pumps/fans ducts mills and auxiliaries power cycle piping lp piping at 1x150 mw lapanga odhisa
Read moreErection, commissioning and trial operation of boiler and power cycle piping for unit 3 and unit 4 of 2x800 mw ntpc lara project
Erection, commissioning and trial operation of boiler and power cycle piping for following packages, 
 1. package-a- unit 3 boiler and common system of 2x800 mw ntpc lara project.
 2. package-b - unit 4 boiler of 2x800 mw ntpc lara project.
Read moreSupply of 02 (two) numbers of porta cabin each at 2x800 mw koderma thermal power station, phase-ii, jharkhand and 1x800 mw sipat super thermal power project, stage-iii, dist.- bilaspur, chattishgarh.
Supply of 02 (two) numbers of porta cabin each at 2x800 mw koderma thermal power station, phase-ii, jharkhand and 1x800 mw sipat super thermal power project, stage-iii, dist.- bilaspur, chattishgarh.
Read moreEngagement of tractor and jcb for facilitating housekeeping job at boiler esp and other areas of stage ii
Engagement of tractor and jcb for facilitating housekeeping job at boiler esp and other areas of stage ii
Read moreRoutine/breakdown/capital maintenance work of raw water treatment plant, dm plant, boiler chemical dosing skids, lp piping, cw treatment plant and upkeep of the area of 6x250mw sstps stage i, ii, iii , iv suratgarh.
Routine/breakdown/capital maintenance work of raw water treatment plant, dm plant, boiler chemical dosing skids, lp piping, cw treatment plant and upkeep of the area of 6x250mw sstps stage i, ii, iii , iv suratgarh.
Read moreAnnual contract for routine breakdown and capital maintenance of cooling tower cw pumps acw pumps ct make up pumps and lp piping of cw, acw and cooling tower of unit 1 to 4 of stage-i phase-i and ii 4x250 mw chhabra
Annual contract for routine breakdown and capital maintenance of cooling tower cw pumps acw pumps ct make up pumps and lp piping of cw, acw and cooling tower of unit 1 to 4 of stage-i phase-i and ii 4x250 mw chhabra
Read moreAnnual contract for routine breakdown capital maintenance of pre treatment plant, dm plant, lp piping, boiler chemical dosing skids ,cw treatment and side stream filtration system chlorination plant and up keep of the area of phase i and ii , stage
Annual contract for routine breakdown capital maintenance of pre treatment plant, dm plant, lp piping, boiler chemical dosing skids ,cw treatment and side stream filtration system chlorination plant and up keep of the area of phase i and ii , stage
Read moreAnnual contract for routine breakdown capital maintenance of pre treatment plant, dm plant, lp piping, boiler chemical dosing skids ,cw treatment and side stream filtration system chlorination plant and up keep of the area of phase i and ii , stage
Annual contract for routine breakdown capital maintenance of pre treatment plant, dm plant, lp piping, boiler chemical dosing skids ,cw treatment and side stream filtration system chlorination plant and up keep of the area of phase i and ii , stage
Read moreRoutine / breakdown /capital maintenance work of ccw / acw pumps ,cooling tower, associated lp piping, eot cranes, and up keep of the surrounding area of 6x250 mw, suratgarh thermal power station, stage-i, ii, iii and 1v (unit 1 to 6),suratgarh.
Routine / breakdown /capital maintenance work of ccw / acw pumps ,cooling tower, associated lp piping, eot cranes, and up keep of the surrounding area of 6x250 mw, suratgarh thermal power station, stage-i, ii, iii and 1v (unit 1 to 6),suratgarh.
Read moreNctps ii 2 x 600 mw operation circle o e division unit i to carry out shift works and recording of equipment parameters at various locations of esp boiler 40 mtr turbine 0 mtr turbine 8 5 17 5 mtr and common locations such as foph and switch yard
Nctps ii 2 x 600 mw operation circle o e division unit i to carry out shift works and recording of equipment parameters at various locations of esp boiler 40 mtr turbine 0 mtr turbine 8 5 17 5 mtr and common locations such as foph and switch yard
Read moreof your Industry type