Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repairing Of 11 Kv 400 A Ocb Switch Crompton Greaves Ctr Controlling To 100 Kva Power Transformer 11 Kv/440 V Installed At Outsourcing Camp Bastacolla Ocp.
|
Description |
Repairing Of 11 Kv 400 A Ocb Switch Crompton Greaves Ctr Controlling To 100 Kva Power Transformer 11 Kv/440 V Installed At Outsourcing Camp Bastacolla Ocp.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_317016_1 |
Reference Number |
BCCL/BA-IX/ENM/24-25/117 09/09/2024 |
Tender Fee | 0 |
EMD | 1600 |
Tender Value | |
Place | BASTACOLLA AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=328536 |
Start Date | September 09, 2024 14:30 |
End Date |
23/09/2024 ( Expired 268 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Complete repairing of 400 amps 11kv electroteknica make sl. no- 8363 vcb switch with busbar for primary controlling of 2mva, 11kv/3.3kv power transformer at main substation rocp/sj.
Complete repairing of 400 amps 11kv electroteknica make sl. no- 8363 vcb switch with busbar for primary controlling of 2mva, 11kv/3.3kv power transformer at main substation rocp/sj.
Read moreRepairing / maintenance of 11kv ocb switch 400 a make biecco lowrie power feeding to 750 kva power transformer at bastacolla colliery.
Repairing / maintenance of 11kv ocb switch 400 a make biecco lowrie power feeding to 750 kva power transformer at bastacolla colliery.
Read moreRepairing and replacement of insulator bushing with connection terminal and top cover an primary and secondary side cork sheet for 500kva power transformer 11kv/ 550v and installation near goushala for feeding power to borehole submersible pump set 0
Repairing and replacement of insulator bushing with connection terminal and top cover an primary and secondary side cork sheet for 500kva power transformer 11kv/ 550v and installation near goushala for feeding power to borehole submersible pump set 0
Read morePartial repairing of 11kv/3.3 kv 2000 kva power transformer apeec makes sl. no- v980/87 at rocp substation under rocp/sj
Partial repairing of 11kv/3.3 kv 2000 kva power transformer apeec makes sl. no- v980/87 at rocp substation under rocp/sj
Read moreTemporary power connection from ms mppkvvcl with the new installation of transformer 11kv 440v 112 kw at chp silo site near kodaili village at rampur batura ocp of sohagpur area secl
Temporary power connection from ms mppkvvcl with the new installation of transformer 11kv 440v 112 kw at chp silo site near kodaili village at rampur batura ocp of sohagpur area secl
Read moreFor complete rewinding of 500kva 11kv/440v transformer eef make sl.no.4010852 installed at nichitpur township substation under sijua area.
For complete rewinding of 500kva 11kv/440v transformer eef make sl.no.4010852 installed at nichitpur township substation under sijua area.
Read moreMaintenance and repairing of 01 nos 1mva 11 kv/3.3kv power transformer and 11 kv , 400 amp gec ocb sl.- sar/ocb/01 and 3.3kv , 400a belgium make ocb sl. no.-sar/ocb/02 at 10 no main substation sarubera project under kuju area.
Maintenance and repairing of 01 nos 1mva 11 kv/3.3kv power transformer and 11 kv , 400 amp gec ocb sl.- sar/ocb/01 and 3.3kv , 400a belgium make ocb sl. no.-sar/ocb/02 at 10 no main substation sarubera project under kuju area.
Read moreFor repairing of 10/16 kva to 630 kva damage distribution transformer at workshop ganjdundwara (kasganj) under ewd, aligarh
For repairing of 10/16 kva to 630 kva damage distribution transformer at workshop ganjdundwara (kasganj) under ewd, aligarh
Read moreFor repairing of 10/16 kva to 100 kva damage distribution transformer at workshop agra under ewd, agra
For repairing of 10/16 kva to 100 kva damage distribution transformer at workshop agra under ewd, agra
Read more(a)new winding of 07 nos. vibrator transformer and new core changing volt input 220v, 2.17amp to volt output 440v, 12.5amp of rcb 00 and (b) repairing of 24 no. plate rectifier unit 24 amp for vibrator ing panel at rcb 00 out of 32 nos. vibrator
(a)new winding of 07 nos. vibrator transformer and new core changing volt input 220v, 2.17amp to volt output 440v, 12.5amp of rcb 00 and (b) repairing of 24 no. plate rectifier unit 24 amp for vibrator ing panel at rcb 00 out of 32 nos. vibrator
Read moreof your Industry type