Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 11/0.4 Kv, 1x250 Kva Temporary Sub Station On Double Pole Structure And Laying Of L.T. Cable From Transformer To Concern Camp In Entire Mela Area As Per Requirement For Electrification Work Of Maha Kumbh Mela 2024 25
|
Description |
Refer To Tender Deion
|
Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
Tender Id | 2024_PVVNV_938269_1 |
Reference Number |
57/TMKM/EC/2024-25 |
Tender Fee | 1770 |
EMD | 24260 |
Tender Value | |
Place | TMKM, Prayagraj |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1641687 |
Start Date | August 16, 2024 23:30 |
End Date |
30/08/2024 ( Expired 261 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 3 wire, 3 phase, 11/0.4 kv lt electric line with 9.00 mtr 150 x 150 rs joist pole and 3 phase transformer (sub station) 11/0.4 kva including installation with all required materials etc. all complete (reach-iii)
Construction of 3 wire, 3 phase, 11/0.4 kv lt electric line with 9.00 mtr 150 x 150 rs joist pole and 3 phase transformer (sub station) 11/0.4 kva including installation with all required materials etc. all complete (reach-iii)
Read moreConstruction of transformer plinth,vcb, ct, cable box support structure, cable trench at ratua 33/11 kv sub-station under chanchal division in the district of malda
Construction of transformer plinth,vcb, ct, cable box support structure, cable trench at ratua 33/11 kv sub-station under chanchal division in the district of malda
Read moreFabricated steel items (non-welded) i.e. (a) sub-station structure for mounting of 11/0.4 kv transformers on double pole (b) 1.4 metre long ms channel bracket with clamp against tn-4992.
Fabricated steel items (non-welded) i.e. (a) sub-station structure for mounting of 11/0.4 kv transformers on double pole (b) 1.4 metre long ms channel bracket with clamp against tn-4992.
Read moreConstruction of transformer plinth, vcb, ct, cable box support structure, cable trench and crushed stone spreading at mobarakpur 33/11 kv sub-station under gazole division, in the district of malda
Construction of transformer plinth, vcb, ct, cable box support structure, cable trench and crushed stone spreading at mobarakpur 33/11 kv sub-station under gazole division, in the district of malda
Read moreLaying of 1.98 km 33 kv 3c 400 sq mm xlpe ug cable for uttarabhag dhosa 33 kv ckt for dhosa temporary sub station under joynagar division
Laying of 1.98 km 33 kv 3c 400 sq mm xlpe ug cable for uttarabhag dhosa 33 kv ckt for dhosa temporary sub station under joynagar division
Read more11/0.4 kv sub station double pole structure (without support) and 11 kv line dp set
11/0.4 kv sub station double pole structure (without support) and 11 kv line dp set
Read moreWork of renovation and maintenance of 11/0.4 250/400 kva transformer plinth and fencing at 33/11 kv sub station piran kaliyar and bharampur ii under edd urban under edc roorkee
Work of renovation and maintenance of 11/0.4 250/400 kva transformer plinth and fencing at 33/11 kv sub station piran kaliyar and bharampur ii under edd urban under edc roorkee
Read moreFor the work of maint of 11/0.4 kv ss dismantling and uprooting of spare poles of ht/lt lines and balancing of load on 1000 kva tf, erection of pole and laying of lt ab conductor from 250 kva tf with misc. works area of ee 11 kv line south, mrt.
For the work of maint of 11/0.4 kv ss dismantling and uprooting of spare poles of ht/lt lines and balancing of load on 1000 kva tf, erection of pole and laying of lt ab conductor from 250 kva tf with misc. works area of ee 11 kv line south, mrt.
Read moreConstruction of 11kv ht line at various places of municipality m badshahpur under the area of ee edd mshahar jaunpur, work of laying additional 11 kv xlpe cable for 400 kva tf installed on station road and 400 kva tf jama masjid from sipah m badshah
Construction of 11kv ht line at various places of municipality m badshahpur under the area of ee edd mshahar jaunpur, work of laying additional 11 kv xlpe cable for 400 kva tf installed on station road and 400 kva tf jama masjid from sipah m badshah
Read more(1) repairing and overhauling of 200a,550v,sl.no.10962 kilburn make,gtc unit,agkcc.(2) complete repairing of 400 amps ocb switch make biecco lawrie 6.6 kv sl.no.116937 controlling for 300 kva lighting transformer at old area office sub-station akwm
(1) repairing and overhauling of 200a,550v,sl.no.10962 kilburn make,gtc unit,agkcc.(2) complete repairing of 400 amps ocb switch make biecco lawrie 6.6 kv sl.no.116937 controlling for 300 kva lighting transformer at old area office sub-station akwm
Read moreof your Industry type