Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Amc Of Onsite Repairing, Installation, Maintenance Cum Replacement Of The Worn Out Component Of The Auxiliary System Of The Pump Motor For Its Operation At Balkudra Ocp And Domestic Water Supply As And When Required Basis For Fy 2024 25 Under Bhk
|
| Description |
Amc Of Onsite Repairing, Installation, Maintenance Cum Replacement Of The Worn Out Component Of The Auxiliary System Of The Pump Motor For Its Operation At Balkudra Ocp And Domestic Water Supply As And When Required Basis For Fy 2024 25 Under Bhk
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_315373_1 |
|
Reference Number |
PE(EnM)/BHK/e Tender/24-25/16 |
| Tender Fee | 0 |
| EMD | 9900 |
| Tender Value | |
| Place | Office of Project Engineer EnM Bhurkunda colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=326829 |
| Start Date | August 17, 2024 23:30 |
| End Date |
Expired
28/08/2024
Expired 670 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Running repair cum replacement of the worn out components of the auxiliary system of the pump motor sets in operation in mine, at karo ocp, under bnk area.
Running repair cum replacement of the worn out components of the auxiliary system of the pump motor sets in operation in mine, at karo ocp, under bnk area.
Read moreAt site running repairing maintenance cum replacement of the worn out component of the auxiliary system of the pump motor its operation under sayal- d project. with trail and testing
At site running repairing maintenance cum replacement of the worn out component of the auxiliary system of the pump motor its operation under sayal- d project. with trail and testing
Read moreFabrication of new base plate required for 2000gpm pump and associate motor installation and mechanical repairing of 160kw, 3.3kv motor for dewatering under balkudra ocp for bhurkunda project under barka sayal area.
Fabrication of new base plate required for 2000gpm pump and associate motor installation and mechanical repairing of 160kw, 3.3kv motor for dewatering under balkudra ocp for bhurkunda project under barka sayal area.
Read moreFabrication of new base plate required for 2000gpm pump and associate motor installation and mechanical repairing of 160kw, 3.3kv motor for dewatering under balkudra ocp for bhurkunda project under barka sayal area.
Fabrication of new base plate required for 2000gpm pump and associate motor installation and mechanical repairing of 160kw, 3.3kv motor for dewatering under balkudra ocp for bhurkunda project under barka sayal area.
Read moreTtps operation circle cad acwph aoh unit i dismantling and replacement of worn out and punctured 200 nb ms erw pipe lines connecting the auxiliary cooling water to turbine auxiliary equipments
Ttps operation circle cad acwph aoh unit i dismantling and replacement of worn out and punctured 200 nb ms erw pipe lines connecting the auxiliary cooling water to turbine auxiliary equipments
Read moreReplacement of worn-out impeller of 6up4 pump for siding-3 water supply to fog cannon at lajkura ocp, ib valley area
Replacement of worn-out impeller of 6up4 pump for siding-3 water supply to fog cannon at lajkura ocp, ib valley area
Read moreOnsite repairing of the one no. of 2000 gpm pump, 150 meter head, 3 chr, mnp make and onsite commissioning with the motor, in mine w.r.t. karo ocp, bnk area
Onsite repairing of the one no. of 2000 gpm pump, 150 meter head, 3 chr, mnp make and onsite commissioning with the motor, in mine w.r.t. karo ocp, bnk area
Read moreRepair cum replacement of the components undergone wear and tear of the auxiliary systems of the 1000 g.p.m. and 2000 g.p.m. pumps in operation in mine, at karo ocp, bnk area.
Repair cum replacement of the components undergone wear and tear of the auxiliary systems of the 1000 g.p.m. and 2000 g.p.m. pumps in operation in mine, at karo ocp, bnk area.
Read moreReplacement repair works of damaged worn out guide vanes in pa sa fg ducts during annual overhaul of unit xi for the fy 2025 26.
Replacement repair works of damaged worn out guide vanes in pa sa fg ducts during annual overhaul of unit xi for the fy 2025 26.
Read moreRepairing of the one no. of 2000 gpm pump, 150 meter head, 3 chr, mnp make and onsite commissioning with the motor, in mine w.r.t. karo ocp, bnk area
Repairing of the one no. of 2000 gpm pump, 150 meter head, 3 chr, mnp make and onsite commissioning with the motor, in mine w.r.t. karo ocp, bnk area
Read moreof your Industry type