Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚢 Invitation For Design Verification And Validation Services 🛠️ Mazagon Dock Shipbuilders Limited (Mdl), A Leading Public Sector Undertaking, Is Seeking A Service Provider For The Critical Role Of Design Verification And Validation For Opv (Offshore Patrol Vessel) And Fpv (Fast Patrol Vessel) Vessels. 🛥️ 📅 Submission Deadline: April 10, 2024, 3:00 Pm This Project Is Based In Mumbai And Requires A Provider With A Proven Track Record In Maritime Design Verification And Validation. Interested Parties Should Submit Detailed Proposals, Including Methodologies, Timelines, And Qualifications, By The Specified Deadline. Keywords: Design Verification, Validation, Opv, Fpv, Mazagon Dock Shipbuilders Limited, Maritime, Shipbuilding, Government Contract, Mumbai| Particulars | Details |
|---|---|
| Title |
Design Verification And Validation For Opv And Fpv Vessel
|
| Description |
Design Verification And Validation For Opv And Fpv Vessel
|
| Organisation | Mazagon Dock Shipbuilders Limited | Public Sector Undertakings |
| Tender Id | 2024_MDL_94702_2 |
|
Reference Number |
8000001258 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
eprocuremdlgsl.nic.in?page=FrontEndTenderDetailsExternal&service=page&tnid=104145 |
| Start Date | April 06, 2024 14:40 |
| End Date |
Expired
10/04/2024
Expired 918 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Thrust chamber validation fixture part 1,thrust chamber validation fixture part 2,thrust chamber validation fixture part 3.1,thrust chamber validation fixture part 3.2,thrust chamber validation fixture part 3.3,thrust chamber validation fixture part 3.4
Thrust chamber validation fixture part 1,thrust chamber validation fixture part 2,thrust chamber validation fixture part 3.1,thrust chamber validation fixture part 3.2,thrust chamber validation fixture part 3.3,thrust chamber validation fixture part 3.4
Read moreTester for compression check,rudder defelection verification template,flapperon defelection verification template,elevator defelection verification template
Tester for compression check,rudder defelection verification template,flapperon defelection verification template,elevator defelection verification template
Read moreSupply, design, verification, statutory approval, conversion, testing, installation, commissioning and obtaining statutory approvals from petroleum and explosives safety organization (peso) for conversion of one existing 6000 litre vacuum insulated liquid argon (lar) storage vessel into a liquid oxygen (lox) storage vessel and connecting the converted vessel with the existing oxygen ambient vaporizer through stainless steel pipeline as per scope of work.
Supply, design, verification, statutory approval, conversion, testing, installation, commissioning and obtaining statutory approvals from petroleum and explosives safety organization (peso) for conversion of one existing 6000 litre vacuum insulated liquid argon (lar) storage vessel into a liquid oxygen (lox) storage vessel and connecting the converted vessel with the existing oxygen ambient vaporizer through stainless steel pipeline as per scope of work.
Read moreof your Industry type