Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Lvr To Motor Road Con Reconstruction Improvement And Damrikaran Work Of Chitai Petsal Bhetadangi Petsal Bamanswal Suwakhan In Km. 10, 11 And Reconstruction Improvement And Damrikaran Work In Km. 12 To 14 Under Cm Ghoshna No 468 2023
|
| Description |
Lvr To Motor Road Con Reconstruction Improvement And Damrikaran Work Of Chitai Petsal Bhetadangi Petsal Bamanswal Suwakhan In Km. 10, 11 And Reconstruction Improvement And Damrikaran Work In Km. 12 To 14 Under Cm Ghoshna No 468 2023
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_pwd_87105_1 |
|
Reference Number |
3814/Nivida-01/2025-26 dated 02/09/2025 |
| Tender Fee | 5900 |
| EMD | 8.77 Lakh |
| Tender Value | |
| Place | Jageshwar |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=103367 |
| Start Date | September 19, 2025 15:30 |
| End Date |
Expired
03/10/2025
Expired 250 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road
Under the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road
Read moreRenewal work by sdbc in km 6 to 8 and 10 to 13 of selaqui-bhauwala-dunga-nanda ki chowki motor road in sahaspur constituency of dehradun district under annual repair 2026-27.
Renewal work by sdbc in km 6 to 8 and 10 to 13 of selaqui-bhauwala-dunga-nanda ki chowki motor road in sahaspur constituency of dehradun district under annual repair 2026-27.
Read moreDevelopment and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector
Development and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector
Read moreImprovement of road with bituminous road surface and rcc drain in vrindavan colony road no-3n under ward no-04
Improvement of road with bituminous road surface and rcc drain in vrindavan colony road no-3n under ward no-04
Read moreImprovement of drain and road at shastri nagar from block no 126 to block no 135 in shastri nagar under ward 91 zone 06.
Improvement of drain and road at shastri nagar from block no 126 to block no 135 in shastri nagar under ward 91 zone 06.
Read moreConstruction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Construction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Read moreImprovement of drain and road at vijay nagar from block no 192 to block no 193 and block no 106 to block no 110 in vijay nagar under ward 33 zone 06
Improvement of drain and road at vijay nagar from block no 192 to block no 193 and block no 106 to block no 110 in vijay nagar under ward 33 zone 06
Read moreRestoration of rain damages on jia manikaran road km. 1/610 to 35/110 (sh- balance work of metalling and tarring , v-shaped drain,u-shape drain at various reached in km 1/610 to 35/110 under crf (job no crf-hp-2023 -24/188)
Restoration of rain damages on jia manikaran road km. 1/610 to 35/110 (sh- balance work of metalling and tarring , v-shaped drain,u-shape drain at various reached in km 1/610 to 35/110 under crf (job no crf-hp-2023 -24/188)
Read moreRejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Read moreImprovement work of road from house no. lig 2244 to lig 2194, 2206 via lig 2221 in scheme 3 under zone 06 ward 23 housing development by laying drain and interlocking tiles.
Improvement work of road from house no. lig 2244 to lig 2194, 2206 via lig 2221 in scheme 3 under zone 06 ward 23 housing development by laying drain and interlocking tiles.
Read moreof your Industry type