Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Works To The Water Supply Distribution System By Releasing The Old Unutilized Steel Tank From Its Position And Erecting Near Filter House For Providing Potable Water To The Residential Colony At Kodayar Lower Camp In Kanyakumari District
|
| Description |
Maintenance Works To The Water Supply Distribution System By Releasing The Old Unutilized Steel Tank From Its Position And Erecting Near Filter House For Providing Potable Water To The Residential Colony At Kodayar Lower Camp In Kanyakumari District
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_531727_1 |
|
Reference Number |
SE/GC/TIN/C10/2024-25 |
| Tender Fee | 0 |
| EMD | 2900 |
| Tender Value | - |
| Place | Kodayar Lower Camp |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=632866 |
| Start Date | March 14, 2025 15:30 |
| End Date |
Expired
27/03/2025
Expired 564 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, erection and commissioning of new ofc cable with its allied accessories suitably from kodayar power house-1 to kodayar upper camp ib through existing poles of 11 kv line through valve house area for ensuring communication facility at kdr uc
Supply, erection and commissioning of new ofc cable with its allied accessories suitably from kodayar power house-1 to kodayar upper camp ib through existing poles of 11 kv line through valve house area for ensuring communication facility at kdr uc
Read moreImprovement works to the 4f(p) type quarters block 1 (4 tenements with plinth area of 3403 square feet) by replacing the existing damaged flooring with tile flooring, replacement at kodayar lower camp
Improvement works to the 4f(p) type quarters block 1 (4 tenements with plinth area of 3403 square feet) by replacing the existing damaged flooring with tile flooring, replacement of damaged wooden doors and s with steel at kodayar lower camp
Read moreImprovement works to the 6g(p) type quarters block1, 2 and 3 by replacing the existing damaged wooden doors and s with steel colour washing the interior and exterior walls at kodayar lower camp
Improvement works to the 6g(p) type quarters block1, 2 an 3 ( 18 tenements with plinth area of 9396.90 square feet) by replacing the existing damaged wooden doors and s with steel colour washing the interior and exterior walls at kodayar lower
Read moreMarching of pontoon with 2000gpm pump motor from existing position to the lower side of the sump and necessary di of its delivery range at main patch of phularitand, amp colliery
Marching of pontoon with 2000gpm pump motor from existing position to the lower side of the sump and necessary di 
 of its delivery range at main patch of phularitand, amp colliery
Read moreMarching of pontoon with 3000gpm pump motor from existing position to the another lower side of the sump and di of its pipe line at main patch of phularitand, amp colliery.
Marching of pontoon with 3000gpm pump motor from existing position to the another lower side of the sump and di of its pipe line at main patch of phularitand, amp colliery.
Read moreMarching of pontoon with 2000gpm pump motor from existing position to the another lower side of the sump and di of its pipe line at main patch of phularitand, amp colliery.
Marching of pontoon with 2000gpm pump motor 
 from existing position to the another lower side 
 of the sump and di of its pipe line at main 
 patch of phularitand, amp colliery.
Read moreEchp-i- cutting and removing the worn out and damaged rack and pinion gate and newly fabricated rack and pinion gate and erecting in its position in screen c and bypass gate at sch-i.
Echp-i- cutting and removing the worn out and damaged rack and pinion gate and newly fabricated rack and pinion gate and erecting in its position in screen c and bypass gate at sch-i.
Read moreMarching of 1st pontoon with 4000gpm pump motor (five times) from existing position to the another lower side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.
Marching of 1st pontoon with 4000gpm pump motor (five times) from existing position to the another lower side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.
Read moreMarching of 3rd pontoon with 4000gpm pump motor (four times) from existing position to the another lower side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.
Marching of 3rd pontoon with 4000gpm pump motor (four times) from existing position to the another lower 
 side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.
Read more(a)02times marching of pontoon with 2000gpm pump motor from existing position to the another lower side of the sump and leakage repairing of its delivery range and (b) maintenance of above pump at main patch of phularitand, amp colliery.
(a)02times marching of pontoon with 2000gpm pump motor from existing position to the another lower side of the sump and leakage repairing of its delivery range and (b) maintenance of above pump at main patch of phularitand, amp colliery.
Read moreof your Industry type