Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚌 Invitation For E Nit Bids: Bus Services For Smvdsb, Katra 🚌 Shri Mata Vaishno Devi Shrine Board (Smvdsb), A State Government Undertaking, Invites Bids Through E Nit For The Provision Of Bus Services To Transport Officers And Officials Within Katra For A Duration Of Two Years. 📅 Bid Submission Deadline: May 13, 2024, 11:00 Am Tender Fee: Inr 500 Earnest Money Deposit (Emd): Inr 200,000 Interested Bidders Must Submit Detailed Proposals, Including Operational Plans, Pricing, And Service Level Agreements, To Meet The Transportation Needs Of The Smvdsb, Katra. Keywords: E Nit, Bus Services, Transportation, Shri Mata Vaishno Devi Shrine Board, State Govt. And Ut, Katra, Bid, Tender, Emd| Particulars | Details |
|---|---|
| Title |
E Nit For Providing Bus Services For Transportation Of Officers/Officials Of Smvdsb, Katra For A Period Of 02 Yrs
|
| Description |
E Nit For Providing Bus Services For Transportation Of Officers/Officials Of Smvdsb, Katra For A Period Of 02 Yrs
|
| Organisation | SHRI MATA VAISHNO DEVI SHRINE BOARD | State Govt. and UT |
| Tender Id | 2024_SMVSB_248149_1 |
|
Reference Number |
e-NIT No. TO/TPT/K/18 dt 20.04.2024 |
| Tender Fee | 500 |
| EMD | 2 Lakh |
| Tender Value | - |
| Place | SMVDSB, Katra |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=723739 |
| Start Date | April 22, 2024 22:30 |
| End Date |
Expired
13/05/2024
Expired 882 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.
Supply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.
Read moreTransportation of coal from gdk 2 and 2a incline to ocp-1 chp, rg-3 area on weight basis for a period of two years
Transportation of coal from gdk 2 and 2a incline to ocp-1 chp, rg-3 area on weight basis for a period of two years
Read moreTransportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Read moreTransportation of 5.0 million tonnes per annum of coal from mcl to ytpv and ktpg on for destination basis by rsr route via paradip and kakinada ports for a period of two years
Transportation of 5.0 million tonnes per annum of coal from mcl to ytpv and ktpg on for destination basis by rsr route via paradip and kakinada ports for a period of two years
Read moreHiring of trailers for material transportation between areas and within telangana and andhra pradesh states with 20t, 35t flat trailers and 40t low bed trailers under rate contract for a period of two years on per kilometer basis.
Hiring of trailers for material transportation between areas and within telangana and andhra pradesh states with 20t, 35t flat trailers and 40t low bed trailers under rate contract for a period of two years on per kilometer basis.
Read moreTransportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreMacadamization of various roads smvdsb, katra.
Macadamization of various roads smvdsb, katra.
Read moreMacadaminzation of various roads smvdsb, katra.
Macadaminzation of various roads smvdsb, katra.
Read moreof your Industry type