Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Fire And Rescue Service Station With Development Works At Thiyagadurgam In Kallakurichi District
|
| Description |
Construction Of Fire And Rescue Service Station With Development Works At Thiyagadurgam In Kallakurichi District
|
| Organisation | Tamil Nadu Police Housing Corporation | State Govt. and UT |
| Tender Id | 2025_TNPHC_529734_1 |
|
Reference Number |
SE/NC/DB/142/2025 |
| Tender Fee | 0 |
| EMD | 1.72 Lakh |
| Tender Value | - |
| Place | Thiyagadurgam in Kallakurichi District |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=630842 |
| Start Date | March 05, 2025 00:15 |
| End Date |
Expired
17/03/2025
Expired 572 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ktps vii stage/paloncha - supply of fire wall switches for main plant dcs
Tggenco-ktps vii stage/paloncha - supply of fire wall switches for main plant dcs
Read moreProcurement of fire buckets for use at rchp, vkcm, pvk5, jvrocii, jvrchp and ast, kothagudem area
Procurement of fire buckets for use at rchp, vkcm, pvk5, jvrocii, jvrchp and ast, kothagudem area
Read moreTggenco - nshes - design, engineering, supplying, erection, installation and testing of 50kld zinc alume fire water tank at nslcph, nshes, nagarjunasagar.
Tggenco - nshes - design, engineering, supplying, erection, installation and testing of 50kld zinc alume fire water tank at nslcph, nshes, nagarjunasagar.
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for ghogha-panjwara road (sh-84): 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for ghogha-panjwara road (sh-84): 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for akbarnagar-amarpur road (sh-85): 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for akbarnagar-amarpur road (sh-85): 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for saraiya-motipur road (sh-86) 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for saraiya-motipur road (sh-86) 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for runnisaidpur-biswa road (sh-87): 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for runnisaidpur-biswa road (sh-87): 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for baruna bridge-rasiyari road (sh-88) 6-lane (3-lane on each side) at two locations in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for baruna bridge-rasiyari road (sh-88) 6-lane (3-lane on each side) at two locations in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for siswan-siwan road (sh-89) 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for siswan-siwan road (sh-89) 6-lane (3-lane on each side) at one location in the state of bihar
Read moreof your Industry type