Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Development Of 1.9 Mw Chatru Prawra Mhp, Kishtwar Under Independent Power Producer Mode
|
| Description |
Development Of 1.9 Mw Chatru Prawra Mhp, Kishtwar Under Independent Power Producer Mode
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_JKEDA_239063_1 |
|
Reference Number |
JKDA-HDRO/7/2023/1727 |
| Tender Fee | 20000 |
| EMD | 14.25 Lakh |
| Tender Value | - |
| Place | CEO JAKEDA OFFICE |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | December 04, 2023 23:30 |
| End Date |
Expired
05/02/2024
Expired 981 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Independent engineer services for development of the ropeway system from govindghat to hemkund sahib ji in the state of uttarakhand on dbfot mode.
Independent engineer services for development of the ropeway system from govindghat to hemkund sahib ji in the state of uttarakhand on dbfot mode.
Read moreIndependent engineer services for development, operation and maintenance of the ropeway project from kamakhya railway station to kamakhya temple on dbfot mode in the state of assam.
Independent engineer services for development, operation and maintenance of the ropeway project from kamakhya railway station to kamakhya temple on dbfot mode in the state of assam.
Read moreLot-2a electro-mechanical works (except gsu transformer, gis, xlpe cable and switchyard equipment) of 260 mw (2x130mw) dulhasti stage-ii h.e project, kishtwar district of ut of j and k, india
Lot-2a electro-mechanical works (except gsu transformer, gis, xlpe cable and switchyard equipment) of 260 mw (2x130mw) dulhasti stage-ii h.e project, kishtwar district of ut of j and k, india
Read moreIndependent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Independent engineer services for construction of new 4-lane access controlled coastal highway from rameshwar to konark (km.0 to km. 79.400) on hybrid annuity mode in the state of odisha (2nd call)
Read moreOnline tender for fixing rates for reagents with provision of fully automated integrated chemistry analyzer under reagent rental mode and fixing rate contract for supply and installation of fully automated independent integrated chemsitry analyzer
Online tender for fixing rates for reagents with provision of fully automated integrated chemistry analyzer under reagent rental mode and fixing rate contract for supply and installation of fully automated independent integrated chemsitry analyzer
Read moreLot-3 package- hydro-mechanical works for all gates and pressure shaft liners for the implementation of the 260 mw dulhasti stage-ii he project, in kishtwar district of ut of j and k, india
Lot-3 package- hydro-mechanical works for all gates and pressure shaft liners for the implementation of the 260 mw dulhasti stage-ii he project, in kishtwar district of ut of j and k, india
Read moreIndependent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Independent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Read moreRequest for qualification cum rfp for development of 200 mw (plus minus 10 percent) solar plant with 50 or 100mwh battery energy storage system under captive mode for ulbs of mp
Request for qualification cum rfp for development of 200 mw (plus minus 10 percent) solar plant with 50 or 100mwh battery energy storage system under captive mode for ulbs of mp
Read moreConsultancy services for independent engineer of end of pandoh bypass to takoli section of nh-21 from km. 221 305 to km. 242 000 in the state of himachal pradesh under nhdp to be executed on hybrid annunity mode
Consultancy services for independent engineer of end of pandoh bypass to takoli section of nh-21 from km. 221 305 to km. 242 000 in the state of himachal pradesh under nhdp to be executed on hybrid annunity mode
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreof your Industry type