Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Emergency Repairing Of Rain Damage From Nalpur Gp Office To Misteipara Culvert During 2019 2020 Sansad Xi
|
Description |
Emergency Repairing Of Rain Damage From Nalpur Gp Office To Misteipara Culvert During 2019 2020 Sansad Xi
|
Organisation | Government of West Bengal |
Tender Id | 2023_ZPHD_541429_1 |
Reference Number |
14 |
Tender Fee | 500 |
EMD | 4722 |
Tender Value | |
Place | NALPUR GRAM PANCHAYAT OFFICE |
Link | https://wbtenders.gov.in |
Start Date | June 09, 2023 14:30 |
End Date |
05/07/2023 ( Expired 726 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Read moreCa no. cwe/hills/rkt/38 of 2025-2026 provn of chain link fencing from main office via amn points to sheradeval mandir post approx length 1.5 km and ht 09 ft at mil stn pithoragarh
Ca no. cwe/hills/rkt/38 of 2025-2026 provn of chain link fencing from main office via amn points to sheradeval mandir post approx length 1.5 km and ht 09 ft at mil stn pithoragarh
Read moreRestoration of damaged slabs of concrete lining of ubdc hydel channel from rd 0ft to rd 40000ft on both banks during closure of ubdc hydel channel during 2025-26
Restoration of damaged slabs of concrete lining of ubdc hydel channel from rd 0ft to rd 40000ft on both banks during closure of ubdc hydel channel during 2025-26
Read moreHire of vehicle (tipper truck) for clearance of wet waste from slwm cluster kalatang under gp mannarghat to svpmc, brookshabad cluster
Hire of vehicle (tipper truck) for clearance of wet waste from slwm cluster kalatang under gp mannarghat to svpmc, brookshabad cluster
Read moreConstruction of concrete road from dongalon pitch road to mongalpur pitch road under sahaspur gp within indas block in the district of bankura (length 3.500 km)
Construction of concrete road from dongalon pitch road to mongalpur pitch road under sahaspur gp within indas block in the district of bankura (length 3.500 km)
Read moreConstruction of boundary wall along with internal campus road from teachers qtr 75, gu to apdcl office including other associated works
Construction of boundary wall along with internal campus road from teachers qtr 75, gu to apdcl office including other associated works
Read moreSpecial repair/replacement of ht overhead line into ht underground cable from airport 2 pole structure to cwe office for varunapuri feeder at sma varunapuri under ge(nw) vasco
Special repair/replacement of ht overhead line into ht underground cable from airport 2 pole structure to cwe office for varunapuri feeder at sma varunapuri under ge(nw) vasco
Read moreInstallation of street lights on the stretch of road from the newly constructed moukhali kheyaghat bridge to mahishara bazar under tambuldaha-i gp of canning-ii block, south 24 parganas
Installation of street lights on the stretch of road from the newly constructed moukhali kheyaghat bridge to mahishara bazar under tambuldaha-i gp of canning-ii block, south 24 parganas
Read moreConstruction of concrete road from fulmoni ashwathama bera house (danga) to rukni rajpahari pmgsy road under patina gp, in nayagram block, district-jhargram
Construction of concrete road from fulmoni ashwathama bera house (danga) to rukni rajpahari pmgsy road under patina gp, in nayagram block, district-jhargram
Read moreConsultancy services for independent engineer during onm of 4laning from km 0.000 to km 26.400 along with 0.700km approach towards nh207 with interchange on nh4 at point) of bangalore to malur section pkg1 from km 26.400 to km 53.500 of malur t
Consultancy services for independent engineer during onm of 4laning from km 0.000 to km 26.400 along with 0.700km approach towards nh207 with interchange on nh4 at point) of bangalore to malur section pkg1 from km 26.400 to km 53.500 of malur t
Read moreof your Industry type