Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Existing Kutcha Drain With Rcc Pucca Drain ,For Monsoon Preparation, In The Periphery Of 50.00 Tonne Siding Weigh Bridge, 60.00 Tonne Siding Weigh Bridge 50.00 Tonne Weigh Bridge In Mines And 60.00 Tonne Weigh Bridge At Mines Of Aadocm
|
| Description |
Repairing Of Existing Kutcha Drain With Rcc Pucca Drain ,For Monsoon Preparation, In The Periphery Of 50.00 Tonne Siding Weigh Bridge, 60.00 Tonne Siding Weigh Bridge 50.00 Tonne Weigh Bridge In Mines And 60.00 Tonne Weigh Bridge At Mines Of Aadocm
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_338006_1 |
|
Reference Number |
GM(D)/SO(C) /E-tender/2025-26/18 dt 20.06.2025 |
| Tender Fee | 0 |
| EMD | 39900 |
| Tender Value | |
| Place | Dhori Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=350392 |
| Start Date | June 21, 2025 15:30 |
| End Date |
Expired
01/07/2025
Expired 342 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Estimate for construction of gen and car parking shed with uv stabilised fiber glass reinforced plastic sheet with rcc foundation in the premises of mayor residence sector-16a faridabad.(recall)
Estimate for construction of gen and car parking shed with uv stabilised fiber glass reinforced plastic sheet with rcc foundation in the premises of mayor residence sector-16a faridabad.(recall)
Read moreNieq 2 of 2026-27, sl no. 2, preparation and submission of detailed project report (dpr), drawing, design, boq etc. in connection with the fire fighting system at- ambari falakata ip, phase-ii. (38.60 acre approx.) (3rd call)
Preparation and submission of detailed project report (dpr), drawing, design, boq etc. in connection with the fire fighting system at- ambari falakata ip, phase-ii. (38.60 acre approx.) (3rd call)
Read moreRestoration of lane and drain and others allied works in ward no. 1, 2, 3, 4, 5, 6, 7, 8 , 9, 14, 19 and 71 and gummat gate after demolition the existing compromised structure by way of re-ecting rcc protection walls upto height of 7-0 on both sid
Restoration of lane and drain and others allied works in ward no. 1, 2, 3, 4, 5, 6, 7, 8 , 9, 14, 19 and 71 and gummat gate after demolition the existing compromised structure by way of re-ecting rcc protection walls upto height of 7-0 on both sid
Read moreSubsoil investigation for construction of new girls hostel with sy (70) bedded capacity and conference/ seminar hall 200 capacity at the campus of bara andulia govt p.t.t.i. in the dist of nadia
Subsoil investigation for construction of new girls hostel with sy (70) bedded capacity and conference/ seminar hall 200 capacity at the campus of bara andulia govt p.t.t.i. in the dist of nadia
Read morePcc approach road and drain at 100 tonne weigh bridge under aadocm of dhori area
Pcc approach road and drain at 100 tonne weigh bridge under aadocm of dhori area
Read moreCleaning and upkeeping of 6 nos of weigh bridges located at aadocm mines under aadocm for 2 years
Cleaning and upkeeping of 6 nos of weigh bridges located at aadocm mines under aadocm for 2 years
Read morePreparation of monsoon by provision and repairing of garland drain cross drainage work in mines, ctr road, repairing drainage work in karo railway siding under karo ocp of bnk area
Preparation of monsoon by provision and repairing of garland drain cross drainage work in mines, ctr road, repairing drainage work in karo railway siding under karo ocp of bnk area
Read moreCleaning of existing garland drain at kdh mines under monsoon preparation under kdh project,nk area.
Cleaning of existing garland drain at kdh mines under monsoon preparation under kdh project,nk area.
Read moreCleaning of existing garland drain and culvert at different locations in mines for monsoon preparation work under karma project of kuju area.
Cleaning of existing garland drain and culvert at different locations in mines for monsoon preparation work under karma project of kuju area.
Read moreCleaning of existing garland drain and culvert at different locations in mines for monsoon preparation work under karma project of kuju area.
Cleaning of existing garland drain and culvert at different locations in mines for monsoon preparation work under karma project of kuju area.
Read moreof your Industry type